Differences between revisions 6 and 7
Revision 6 as of 2009-05-04 16:36:57
Size: 906
Editor: YoichiAso
Comment:
Revision 7 as of 2009-05-04 16:38:13
Size: 918
Editor: YoichiAso
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
This page is intended to be a place to put various information on the working group and to document the activity of the group. This page is expected to evolve to a foundation for the official documentation of the LCGT's sensing and control system. However, since this is not an official document, members are encouraged to put intermediate results to serve as basis for further discussion. This page is intended to be a place to put various information on the working group and to document the activity of the group. This page is expected to evolve to a foundation for the official documentation of the LCGT's sensing and control system. However, since this page itself is not an official document, members are encouraged to put intermediate results to serve as basis for further discussion.

Interferometer Sensing and Control


Objective of the working group

  • To Establish a Robust and Low-Noise Sensing-Control Scheme for the LCGT Interferometer.

About the ISC group and this Wiki page

ISC (Interferometer Sensing and Control) working group is a working group dedicated to the development of a sensing and control scheme for the LCGT. This page is intended to be a place to put various information on the working group and to document the activity of the group. This page is expected to evolve to a foundation for the official documentation of the LCGT's sensing and control system. However, since this page itself is not an official document, members are encouraged to put intermediate results to serve as basis for further discussion.


Organization

Time frame

Task list

LCGT/subgroup/ifo/ISC (last edited 2015-03-16 18:44:41 by KeikoKokeyama)