Differences between revisions 104 and 141 (spanning 37 versions)
Revision 104 as of 2010-11-05 12:47:33
Size: 1914
Comment:
Revision 141 as of 2011-02-25 09:39:27
Size: 2976
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
=== Project time-line and iLCGT organization charts === ----
== News ==
Line 5: Line 6:
[[attachment:timeline(remove).png|{{attachment:timeline(remove).png|Subject to change|width=300}}|width=300]]
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=200}}|width=200]]
=== External review ===
 . February 28 ~ March 4 at ICRR 6F large conference room
 . [[http://gw.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/Reviews#B|Program, files]]
 
==== This review is an open for LCGT collaborators. Everybody, please attend the review as much as possible, because this in one of the few opportunities when you can hear all the aspects of LCGT. ====
Line 8: Line 12:
 * iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration. ----
=== Links ===
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Review for Subsystems]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]]||
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||

 * [[LCGT/Meeting/EVOen|how to use EVO]]
 * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only)

----
=== Project time-line ===

 * Time-line chart is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
Line 11: Line 27:
----
=== iLCGT organization chart ===
Line 12: Line 30:
=== Links ===
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || * [[LCGT/subgroup|iLCGT subsystem wiki]] <<BR>> * [[LCGT/subgroup2|bLCGT wiki]] <<BR>> * [[LCGT/AIC|advanced-study group wiki]]||
||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]]

 * iLCGT subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].
 * More detailed organization chart is [[xxx|here]] (TBA).
Line 18: Line 37:
 .[[LCGT/Technical|TD wiki page]] (parameters, simulation codes, etc.)  .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
Line 20: Line 40:
 .[[LCGT/Terminology|Terminology]]
Line 30: Line 51:
 .[[newusers|How to use this wiki page]]  .How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
Line 32: Line 53:
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)

LCGT wiki


News

External review

  • February 28 ~ March 4 at ICRR 6F large conference room
  • Program, files

This review is an open for LCGT collaborators. Everybody, please attend the review as much as possible, because this in one of the few opportunities when you can hear all the aspects of LCGT.


Meetings

Biweekly LCGT meeting
LCGT f2f meeting
Chief Meeting
Review for Subsystems

Subsystem

iLCGT wiki
bLCGT wiki
advanced-study group wiki

Special WG

LCGT Roadmap
RSE Roadmap
IFO Bandwidth (~2009)
SPI study (~2009)

Documents

public
internal (password req.)
how to upload documents


Project time-line

  • Time-line chart is here (password protected).

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


iLCGT organization chart

approved on Nov 2nd

  • iLCGT subsystem member list is here.

  • More detailed organization chart is here (TBA).


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)