Differences between revisions 137 and 171 (spanning 34 versions)
Revision 137 as of 2011-01-12 10:15:06
Size: 2583
Comment:
Revision 171 as of 2011-06-20 15:51:35
Size: 3032
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
-----
== News ==

 * [[LCGT/Meeting/Reviews#C|Program Advisory Board (Review C)]] will be held on June 21-22, 2011 at ICRR 6F.
 * [[LCGT/Meeting/f2f/Top|Face to face meeting]] on August 3-5
Line 4: Line 10:
Line 6: Line 11:
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Review for Subsystems]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]]||
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|LCGT collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|LCGT subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> [[LCGT/subgroup/ifo/LCGT-LF|LCGT-LF]] || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||
Line 11: Line 16:
 * [[LCGT/subgroup/howtojoin|Mailing lists]]
Line 15: Line 21:
 * Time-line chart is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).  * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
Line 22: Line 28:
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]] [[attachment:organization3.png|{{attachment:organization3.png|approved on Nov 2nd|width=300}}|width=300]]
Line 36: Line 42:
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
Line 45: Line 51:
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)  .[[http://gwcenter.icrr.u-tokyo.ac.jp/|LCGT website]] (in Japanese)

LCGT wiki


News


Meetings

LCGT collaboration meeting
LCGT f2f meeting
Chief Meeting
Reviews

Subsystem

iLCGT wiki
bLCGT wiki
advanced-study group wiki
LCGT subsystem BLOG

Special WG

LCGT Roadmap
RSE Roadmap
IFO Bandwidth (~2009)
SPI study (~2009)
LCGT-LF

Documents

public
internal (password req.)
how to upload documents
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


iLCGT organization chart

approved on Nov 2nd

  • iLCGT subsystem member list is here.

  • More detailed organization chart is here (TBA).


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)