Differences between revisions 138 and 146 (spanning 8 versions)
Revision 138 as of 2011-01-24 18:51:34
Size: 2857
Comment:
Revision 146 as of 2011-03-08 23:03:14
Size: 2765
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
----
= News: =
== 3rd Face to face meeting: February 4-5, 2011 ==
 @ ICRR The Univ. of Tokyo Kashiwa campus 6F conference room
-----
== News ==
-----
=== SVN for LCGT ===
Line 8: Line 8:
 *[[http://gw.icrr.u-tokyo.ac.jp/f2f_registration/11Feb_F2F_Registration.html|Registration page]]
 *[[LCGT/Meeting/f2f/2011Feb|Program]]
Click [[http://gw.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/SVN|here]].
Line 12: Line 11:
Line 14: Line 12:
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Review for Subsystems]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]]|| ||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|LCGT collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|LCGT subsystem BLOG]]||

LCGT wiki


News


SVN for LCGT

Click here.


Meetings

LCGT collaboration meeting
LCGT f2f meeting
Chief Meeting
Reviews

Subsystem

iLCGT wiki
bLCGT wiki
advanced-study group wiki
LCGT subsystem BLOG

Special WG

LCGT Roadmap
RSE Roadmap
IFO Bandwidth (~2009)
SPI study (~2009)

Documents

public
internal (password req.)
how to upload documents


Project time-line

  • Time-line chart is here (password protected).

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


iLCGT organization chart

approved on Nov 2nd

  • iLCGT subsystem member list is here.

  • More detailed organization chart is here (TBA).


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)