Differences between revisions 142 and 222 (spanning 80 versions)
Revision 142 as of 2011-02-25 09:39:51
Size: 2977
Comment:
Revision 222 as of 2012-05-30 09:15:55
Size: 3041
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= LCGT wiki = = KAGRA wiki =
Line 3: Line 3:
---- -----
Line 5: Line 5:

=== External review ===
 . February 28 ~ March 4 at ICRR 6F large conference room
 . [[http://gw.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/Reviews#B|Program, files]]
 
==== This review is open for all LCGT collaborators. Everybody, please attend the review as much as possible, because this in one of the few opportunities when you can hear all the aspects of LCGT. ====
Line 14: Line 8:
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Review for Subsystems]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]]||
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]] <<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||
Line 18: Line 12:
 * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only)  * [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|Conference calender]] (Japanese only)
 * [[LCGT/subgroup/howtojoin|Mailing lists]]
Line 23: Line 18:
 * Time-line chart is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
 * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
 * bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Line 28: Line 23:
=== iLCGT organization chart === === Organization chart (design/construction phase) ===
Line 30: Line 25:
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]] [[attachment:organization3.png|{{attachment:organization4.png|approved on Nov 2nd|width=300}}|width=300]]
Line 32: Line 27:
 * iLCGT subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].
 * More detailed organization chart is [[xxx|here]] (TBA).
 * Subsystem members are listed [[LCGT/iLCGT/Subgroup/Members|here]].
Line 36: Line 30:
=== Technical Details ===
 .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
=== Official Sensitivity of bKAGRA ===
Line 40: Line 32:
 .[[LCGT/Terminology|Terminology]]
Line 42: Line 33:
 * Website about the KAGRA sensitivity is [[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|here]].
 * Parameter list is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1082|here]].
Line 43: Line 36:
=== LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
=== KAGRA Official Documents ===
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]]
 .[[https://granite.phys.s.u-tokyo.ac.jp/svn/
LCGT/trunk/ICD|Interface Control Document (ICD)]] (Also see [[LCGT/Interface|Interface Control wiki]])
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management Plan (SEMP)]]
Line 50: Line 44:
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 .[[LCGT/old|Old wiki page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)
 . [[LCGT/Terminology|Terminology]]
 . [[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 . How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 . [[LCGT/old|Old wiki page]]
 . KAGRA webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]])

KAGRA wiki


News


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
Chief Meeting
Reviews

Subsystem

iKAGRA wiki
bKAGRA wiki
advanced-study group wiki
KAGRA subsystem BLOG

Special WG

KAGRA Roadmap
RSE Roadmap
Bandwidth (~2009, LF, 22cm)
Instrument
SPI study (~2009)

Documents

JGWDoc
how to upload documents
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
  • bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.


Organization chart (design/construction phase)

approved on Nov 2nd

  • Subsystem members are listed here.


Official Sensitivity of bKAGRA

latest sensitivity curve

  • Website about the KAGRA sensitivity is here.

  • Parameter list is here.


KAGRA Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)