Line 1: Line 1:
= LCGT wiki = = KAGRA wiki =
Line 5: Line 5:
-----
=== External review ===
 . February 28 ~ March 4 at [[http://www.icrr.u-tokyo.ac.jp/access/index_eng.html|ICRR 6F large conference room]]
Line 9: Line 6:
 . [[http://gw.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/Meeting/Reviews#B|Program, review documents and presentation files]]
 
==== This review is open for all LCGT collaborators. Everybody, please attend the review as much as possible, because this in one of the few opportunities when you can hear all the aspects of LCGT. ====
[[LCGT/Meeting/Reviews/External|External Review]] April 17-20, 2012
Line 15: Line 10:
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|LCGT collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Review for Subsystems]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|LCGT subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||
Line 20: Line 15:
 * [[LCGT/subgroup/howtojoin|Mailing lists]]
Line 24: Line 20:
 * Time-line chart is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
 * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
 * bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Line 29: Line 25:
=== iLCGT organization chart === === iKAGRA organization chart ===
Line 31: Line 27:
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]] [[attachment:organization3.png|{{attachment:organization4.png|approved on Nov 2nd|width=300}}|width=300]]
Line 33: Line 29:
 * iLCGT subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].
 * More detailed organization chart is [[xxx|here]] (TBA).
 * iKAGRA subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].
Line 38: Line 33:
 .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/iLCGT/TD|iKAGRA TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bKAGRA TD wiki page]] (parameters, simulation codes, etc.)
Line 44: Line 39:
=== LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
=== KAGRA Official Documents ===
 .[[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|KAGRA official sensitivity]]
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]]
 .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]])
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management Plan (SEMP)]]
Line 51: Line 48:
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 .[[LCGT/old|Old wiki page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)
 . [[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 . How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 . [[LCGT/old|Old wiki page]]
 . KAGRA webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]])

KAGRA wiki


News

External Review April 17-20, 2012


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
Chief Meeting
Reviews

Subsystem

iKAGRA wiki
bKAGRA wiki
advanced-study group wiki
KAGRA subsystem BLOG

Special WG

KAGRA Roadmap
RSE Roadmap
Bandwidth (~2009, LF, 22cm)
Instrument
SPI study (~2009)

Documents

public
internal (password req.)
how to upload documents
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
  • bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.


iKAGRA organization chart

approved on Nov 2nd

  • iKAGRA subsystem member list is here.


Technical Details

latest sensitivity curve


KAGRA Official Documents


Others