Differences between revisions 152 and 197 (spanning 45 versions)
Revision 152 as of 2011-04-05 23:09:48
Size: 2952
Comment:
Revision 197 as of 2012-02-02 00:53:21
Size: 3329
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * LCGT international collaboration meeting on 5/10, 15:00(JST)
 * [[LCGT/Meeting/Reviews#C|Program Advisory Board(Review C)]] will be held on June 21-22, 2011 at ICRR 6F.
[[LCGT/Meeting/f2f/2012Feb|KAGRA f2f Meeting]] 2012.2.2-4
Line 12: Line 11:
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[http://gw.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/SVN|SVN]]|| ||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||
Line 21: Line 20:
 * Time-line chart is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).  * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
Line 28: Line 27:
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]] [[attachment:organization3.png|{{attachment:organization3.png|approved on Nov 2nd|width=300}}|width=300]]
Line 42: Line 41:
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
 .[[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|LCGT official sensitivity]]
 .[[http://gwdoc
.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]])
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management P
lan (SEMP)]]
Line 48: Line 49:
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 .[[LCGT/old|Old wiki page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)
 . [[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 . How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 . [[LCGT/old|Old wiki page]]
 . LCGT webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]])

LCGT wiki


News

KAGRA f2f Meeting 2012.2.2-4


Meetings

LCGT collaboration meeting
LCGT f2f meeting
Chief Meeting
Reviews

Subsystem

iLCGT wiki
bLCGT wiki
advanced-study group wiki
LCGT subsystem BLOG

Special WG

LCGT Roadmap
RSE Roadmap
Bandwidth (~2009, LF, 22cm)
Instrument
SPI study (~2009)

Documents

public
internal (password req.)
how to upload documents
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


iLCGT organization chart

approved on Nov 2nd

  • iLCGT subsystem member list is here.

  • More detailed organization chart is here (TBA).


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)