Differences between revisions 154 and 155
Revision 154 as of 2011-04-18 00:54:11
Size: 3011
Comment:
Revision 155 as of 2011-04-18 01:01:59
Size: 3057
Comment:
Deletions are marked like this. Additions are marked like this.
Line 6: Line 6:
 * LCGT Interface-parameters meeting on 4/18, 15:00(JST)
 * LCGT international collaboration meeting on 5/10, 15:00(JST)
 * [[LCGT/subgroup/OCG/parametermeeting|LCGT Interface-parameters meeting]] on 4/18, 15:00 at ICRR 6F
 * LCGT international collaboration meeting on 5/10, 15:00 (JST)

LCGT wiki


News


Meetings

LCGT collaboration meeting
LCGT f2f meeting
Chief Meeting
Reviews

Subsystem

iLCGT wiki
bLCGT wiki
advanced-study group wiki
LCGT subsystem BLOG

Special WG

LCGT Roadmap
RSE Roadmap
IFO Bandwidth (~2009)
SPI study (~2009)

Documents

public
internal (password req.)
how to upload documents
SVN


Project time-line

  • Time-line chart is here (password protected).

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


iLCGT organization chart

approved on Nov 2nd

  • iLCGT subsystem member list is here.

  • More detailed organization chart is here (TBA).


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)