Differences between revisions 154 and 225 (spanning 71 versions)
Revision 154 as of 2011-04-18 00:54:11
Size: 3011
Comment:
Revision 225 as of 2012-06-05 12:32:35
Size: 3062
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= LCGT wiki = = KAGRA wiki =
Line 6: Line 6:
 * LCGT Interface-parameters meeting on 4/18, 15:00(JST)
 * LCGT international collaboration meeting on 5/10, 15:00(JST)
 * [[LCGT/Meeting/Reviews#C|Program Advisory Board (Review C)]] will be held on June 21-22, 2011 at ICRR 6F.
Line 12: Line 8:
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|LCGT collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|LCGT subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[http://gw.icrr.u-tokyo.ac.jp/JGWwiki/LCGT/SVN|SVN]]||

 . KAGRA webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]])


||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]] ([[JGWDoc/HowTo/UpLoad|how to upload documents]])<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||
Line 16: Line 16:
 * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only)  * [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|Conference calender]] (Japanese only)
Line 22: Line 22:
 * Time-line chart is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
 * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
 * bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Line 27: Line 27:
=== iLCGT organization chart === === Organization chart (design/construction phase) ===
Line 29: Line 29:
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]] [[attachment:LCGT/organization3.png|{{attachment:LCGT/organization4.png|approved on Nov 2nd|width=300}}|width=300]]
Line 31: Line 31:
 * iLCGT subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].
 * More detailed organization chart is [[xxx|here]] (TBA).
 * Subsystem members are listed [[LCGT/iLCGT/Subgroup/Members|here]].
Line 35: Line 34:
=== Technical Details ===
 .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)

[[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]]
 .[[LCGT/Terminology|Terminology]]
=== Official Sensitivity of bKAGRA ===
[[attachment:LCGT/sensitivity.png|{{attachment:LCGT/sensitivity.png|latest sensitivity curve|width=400}}|width=400]]
Line 41: Line 37:
 * Website about the KAGRA sensitivity is [[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|here]].
 * Parameter list is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1082|here]].
Line 42: Line 40:
=== LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
=== KAGRA Official Documents ===
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]]
 .[[https://granite.phys.s.u-tokyo.ac.jp/svn/
LCGT/trunk/ICD|Interface Control Document (ICD)]] (Also see [[LCGT/Interface|Interface Control wiki]])
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management Plan (SEMP)]]
Line 49: Line 48:
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 .[[LCGT/old|Old wiki page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)
 . [[LCGT/Terminology|Terminology]]
 . [[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 . How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 . [[LCGT/old|Old wiki page]]

KAGRA wiki


News


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
Chief Meeting
Reviews

Subsystem

iKAGRA wiki
bKAGRA wiki
advanced-study group wiki
KAGRA subsystem BLOG

Special WG

KAGRA Roadmap
RSE Roadmap
Bandwidth (~2009, LF, 22cm)
Instrument
SPI study (~2009)

Documents

JGWDoc (how to upload documents)
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
  • bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.


Organization chart (design/construction phase)

approved on Nov 2nd

  • Subsystem members are listed here.


Official Sensitivity of bKAGRA

latest sensitivity curve

  • Website about the KAGRA sensitivity is here.

  • Parameter list is here.


KAGRA Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)