Differences between revisions 189 and 214 (spanning 25 versions)
Revision 189 as of 2011-11-28 19:42:56
Size: 3234
Comment:
Revision 214 as of 2012-05-29 10:25:11
Size: 3238
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= LCGT wiki = = KAGRA wiki =
Line 6: Line 6:
 * [[LCGT/Meeting/weekly|LCGT collaboration meeting (domestic)]], December 12 [[http://gw.icrr.u-tokyo.ac.jp/korea-japan/2012/05/test-blog.html|The 2nd Japan-Korea workshop on KAGRA]], May 28-29th, ICRR.
Line 10: Line 10:
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|LCGT collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|LCGT subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]] <<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||
Line 14: Line 14:
 * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only)  * [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|Conference calender]] (Japanese only)
Line 21: Line 21:
 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
 * iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
 * bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Line 25: Line 25:
=== iLCGT organization chart === === iKAGRA organization chart ===
Line 27: Line 27:
[[attachment:organization3.png|{{attachment:organization3.png|approved on Nov 2nd|width=300}}|width=300]] [[attachment:organization3.png|{{attachment:organization4.png|approved on Nov 2nd|width=300}}|width=300]]
Line 29: Line 29:
 * iLCGT subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].
 * More detailed organization chart is [[xxx|here]] (TBA).
 * iKAGRA subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].
Line 34: Line 33:
 .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/iLCGT/TD|iKAGRA TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bKAGRA TD wiki page]] (parameters, simulation codes, etc.)
Line 40: Line 39:
=== LCGT Official Documents ===
 .[[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|LCGT official sensitivity]]
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .
[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
=== KAGRA Official Documents ===
 .[[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|KAGRA official sensitivity]]
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]]
 .[[https://granite.phys.s.u-tokyo.ac.jp/svn/
LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]]) ([[LCGT/Interface|Interface wiki]])
Line 52: Line 51:
 . LCGT webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]])  . KAGRA webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]])

KAGRA wiki


News

The 2nd Japan-Korea workshop on KAGRA, May 28-29th, ICRR.


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
Chief Meeting
Reviews

Subsystem

iKAGRA wiki
bKAGRA wiki
advanced-study group wiki
KAGRA subsystem BLOG

Special WG

KAGRA Roadmap
RSE Roadmap
Bandwidth (~2009, LF, 22cm)
Instrument
SPI study (~2009)

Documents

JGWDoc
how to upload documents
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
  • bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.


iKAGRA organization chart

approved on Nov 2nd

  • iKAGRA subsystem member list is here.


Technical Details

latest sensitivity curve


KAGRA Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)