Size: 3344
Comment:
|
Size: 3346
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 21: | Line 21: |
* iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration. * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration. |
* iLCGT stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration. * bLCGT stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration. |
KAGRA wiki
News
KAGRA f2f Meeting 2012.2.2-4
Links
KAGRA collaboration meeting |
|
Subsystem |
iKAGRA wiki |
|
Special WG |
KAGRA Roadmap |
|
Documents |
public |
tools for meetings (Japanese only)
Project time-line
Time-line chart is here (password protected).
- iLCGT stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
- bLCGT stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
iKAGRA organization chart
Technical Details
iKAGRA TD wiki page (parameters, simulation codes, etc.)
bKAGRA TD wiki page (parameters, simulation codes, etc.)
KAGRA Official Documents