Size: 3344
Comment:
|
Size: 3233
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
[[LCGT/Meeting/f2f/2012Feb|KAGRA f2f Meeting]] 2012.2.2-4 | TBA |
Line 21: | Line 21: |
* iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration. * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration. |
* iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration. * bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration. |
Line 27: | Line 27: |
[[attachment:organization3.png|{{attachment:organization3.png|approved on Nov 2nd|width=300}}|width=300]] | [[attachment:organization3.png|{{attachment:organization4.png|approved on Nov 2nd|width=300}}|width=300]] |
Line 30: | Line 30: |
* More detailed organization chart is [[xxx|here]] (TBA). |
KAGRA wiki
News
TBA
Links
KAGRA collaboration meeting |
|
Subsystem |
iKAGRA wiki |
|
Special WG |
KAGRA Roadmap |
|
Documents |
public |
tools for meetings (Japanese only)
Project time-line
Time-line chart is here (password protected).
- iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
- bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
iKAGRA organization chart
iKAGRA subsystem member list is here.
Technical Details
iKAGRA TD wiki page (parameters, simulation codes, etc.)
bKAGRA TD wiki page (parameters, simulation codes, etc.)
KAGRA Official Documents