Size: 3346
Comment:
|
Size: 3301
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 6: | Line 6: |
[[LCGT/Meeting/f2f/2012Feb|KAGRA f2f Meeting]] 2012.2.2-4 | [[http://gw.icrr.u-tokyo.ac.jp/korea-japan/2012/05/test-blog.html|http://gw.icrr.u-tokyo.ac.jp/korea-japan/2012/05/test-blog.htmlThe 2nd Japan-Korea workshop on KAGRA]], May 28-29th, ICRR. |
Line 11: | Line 11: |
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])|| | ||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]] <<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])|| |
Line 14: | Line 14: |
* [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only) | * [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|Conference calender]] (Japanese only) |
Line 21: | Line 21: |
* iLCGT stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration. * bLCGT stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration. |
* iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration. * bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration. |
Line 27: | Line 27: |
[[attachment:organization3.png|{{attachment:organization3.png|approved on Nov 2nd|width=300}}|width=300]] | [[attachment:organization3.png|{{attachment:organization4.png|approved on Nov 2nd|width=300}}|width=300]] |
Line 30: | Line 30: |
* More detailed organization chart is [[xxx|here]] (TBA). | |
Line 43: | Line 42: |
.[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]]) | .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]]) ([[LCGT/Interface|Interface wiki]]) |
KAGRA wiki
News
http://gw.icrr.u-tokyo.ac.jp/korea-japan/2012/05/test-blog.htmlThe 2nd Japan-Korea workshop on KAGRA, May 28-29th, ICRR.
Links
KAGRA collaboration meeting |
|
Subsystem |
iKAGRA wiki |
|
Special WG |
KAGRA Roadmap |
|
Documents |
Conference calender (Japanese only)
Project time-line
Time-line chart is here (password protected).
- iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
- bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
iKAGRA organization chart
iKAGRA subsystem member list is here.
Technical Details
iKAGRA TD wiki page (parameters, simulation codes, etc.)
bKAGRA TD wiki page (parameters, simulation codes, etc.)
KAGRA Official Documents