TBA | KAGRA-ATC Kickoff meeting April 24, 2012 |
Line 11: | Line 11: |
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])|| | ||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]] <<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])|| |
Line 14: | Line 14: |
* [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only) | * [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|Conference calender]] (Japanese only) |
KAGRA wiki
News
KAGRA-ATC Kickoff meeting April 24, 2012
Links
KAGRA collaboration meeting |
|
Subsystem |
iKAGRA wiki |
|
Special WG |
KAGRA Roadmap |
|
Documents |
Conference calender (Japanese only)
Project time-line
Time-line chart is here (password protected).
- iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
- bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
iKAGRA organization chart
iKAGRA subsystem member list is here.
Technical Details
iKAGRA TD wiki page (parameters, simulation codes, etc.)
bKAGRA TD wiki page (parameters, simulation codes, etc.)