Differences between revisions 205 and 206
Revision 205 as of 2012-04-09 14:06:57
Size: 3297
Comment:
Revision 206 as of 2012-04-09 14:41:42
Size: 3161
Comment:
Deletions are marked like this. Additions are marked like this.
Line 11: Line 11:
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])|| ||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]] <<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||

KAGRA wiki


News

External Review April 17-20, 2012


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
Chief Meeting
Reviews

Subsystem

iKAGRA wiki
bKAGRA wiki
advanced-study group wiki
KAGRA subsystem BLOG

Special WG

KAGRA Roadmap
RSE Roadmap
Bandwidth (~2009, LF, 22cm)
Instrument
SPI study (~2009)

Documents

JGWDoc
how to upload documents
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
  • bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.


iKAGRA organization chart

approved on Nov 2nd

  • iKAGRA subsystem member list is here.