Differences between revisions 207 and 222 (spanning 15 versions)
Revision 207 as of 2012-04-23 16:43:05
Size: 3134
Comment:
Revision 222 as of 2012-05-30 09:15:55
Size: 3041
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:

KAGRA-ATC Kickoff meeting April 24, 2012
Line 14: Line 12:
 * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only)  * [[http://gwcenter.icrr.u-tokyo.ac.jp/conference/calendar|Conference calender]] (Japanese only)
Line 25: Line 23:
=== iKAGRA organization chart === === Organization chart (design/construction phase) ===
Line 29: Line 27:
 * iKAGRA subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].  * Subsystem members are listed [[LCGT/iLCGT/Subgroup/Members|here]].
Line 32: Line 30:
=== Technical Details ===
 .[[LCGT/iLCGT/TD|iKAGRA TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bKAGRA TD wiki page]] (parameters, simulation codes, etc.)
=== Official Sensitivity of bKAGRA ===
Line 36: Line 32:
 .[[LCGT/Terminology|Terminology]]
Line 38: Line 33:
 * Website about the KAGRA sensitivity is [[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|here]].
 * Parameter list is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1082|here]].
Line 40: Line 37:
 .[[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|KAGRA official sensitivity]]
Line 42: Line 38:
 .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]])  .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] (Also see [[LCGT/Interface|Interface Control wiki]])
Line 48: Line 44:
 . [[LCGT/Terminology|Terminology]]

KAGRA wiki


News


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
Chief Meeting
Reviews

Subsystem

iKAGRA wiki
bKAGRA wiki
advanced-study group wiki
KAGRA subsystem BLOG

Special WG

KAGRA Roadmap
RSE Roadmap
Bandwidth (~2009, LF, 22cm)
Instrument
SPI study (~2009)

Documents

JGWDoc
how to upload documents
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
  • bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.


Organization chart (design/construction phase)

approved on Nov 2nd

  • Subsystem members are listed here.


Official Sensitivity of bKAGRA

latest sensitivity curve

  • Website about the KAGRA sensitivity is here.

  • Parameter list is here.


KAGRA Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)