630
Comment:
|
3344
|
Deletions are marked like this. | Additions are marked like this. |
Line 1: | Line 1: |
= LCGT wiki = ||[[LCGT|PROJECT]] ||[[LCGT/Meeting|MEETING]] ||[[LCGT/Plans|SCHEDULES&TASKS]] ||[[LCGT/Technical|TECHNICAL]] ||[[LCGT/Links|LINKS]] ||[[LCGT/HowTo|HOWTO]] || |
= KAGRA wiki = |
Line 4: | Line 3: |
== LCGT組織 == [[LCGT/subgroup/list|組織図]] |
----- == News == |
Line 7: | Line 6: |
[[LCGT/subgroup|2009年度 推進体制]] | [[LCGT/Meeting/f2f/2012Feb|KAGRA f2f Meeting]] 2012.2.2-4 |
Line 9: | Line 8: |
---- === Links === ||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOG]]|| ||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])|| |
|
Line 10: | Line 13: |
== LCGT Interface Control Document == | * [[LCGT/Meeting/EVOen|how to use EVO]] * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only) * [[LCGT/subgroup/howtojoin|Mailing lists]] |
Line 12: | Line 17: |
[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|ICD on JGWdoc]] | ---- === Project time-line === * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected). * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration. * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration. ---- === iKAGRA organization chart === [[attachment:organization3.png|{{attachment:organization3.png|approved on Nov 2nd|width=300}}|width=300]] * iKAGRA subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]]. * More detailed organization chart is [[xxx|here]] (TBA). ---- === Technical Details === .[[LCGT/iLCGT/TD|iKAGRA TD wiki page]] (parameters, simulation codes, etc.) .[[LCGT/bLCGT/TD|bKAGRA TD wiki page]] (parameters, simulation codes, etc.) [[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]] .[[LCGT/Terminology|Terminology]] ---- === KAGRA Official Documents === .[[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|KAGRA official sensitivity]] .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]] .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]]) .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management Plan (SEMP)]] |
Line 16: | Line 48: |
=== Past issues === *[[LCGT/3month_study|2009年 3ヶ月study]] *[[LCGT/miscellaneous|misc.]] *[[LCGT/nao_archives|(OLD) NAO ARCHIVES]] == Wiki How To == * [[newusers|このwikiが初めての方へ]] |
=== Others === . [[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.) . How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]]) . [[LCGT/old|Old wiki page]] . KAGRA webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]]) |
KAGRA wiki
News
KAGRA f2f Meeting 2012.2.2-4
Links
KAGRA collaboration meeting |
|
Subsystem |
iKAGRA wiki |
|
Special WG |
KAGRA Roadmap |
|
Documents |
public |
tools for meetings (Japanese only)
Project time-line
Time-line chart is here (password protected).
- iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
- bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
iKAGRA organization chart
Technical Details
iKAGRA TD wiki page (parameters, simulation codes, etc.)
bKAGRA TD wiki page (parameters, simulation codes, etc.)
KAGRA Official Documents