3170
Comment:
|
3068
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
The 2nd Japan-Korea workshop on KAGRA, May 28-29th, ICRR. |
|
Line 32: | Line 30: |
=== Technical Details === .[[LCGT/iLCGT/TD|iKAGRA TD wiki page]] (parameters, simulation codes, etc.) .[[LCGT/bLCGT/TD|bKAGRA TD wiki page]] (parameters, simulation codes, etc.) |
=== Official Sensitivity of bKAGRA === |
Line 36: | Line 32: |
.[[LCGT/Terminology|Terminology]] | |
Line 38: | Line 33: |
. Parameter list is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=1082|here]] | |
Line 48: | Line 44: |
. [[LCGT/Terminology|Terminology]] |
KAGRA wiki
News
Links
KAGRA collaboration meeting |
|
Subsystem |
iKAGRA wiki |
|
Special WG |
KAGRA Roadmap |
|
Documents |
Conference calender (Japanese only)
Project time-line
Time-line chart is here (password protected).
- iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
- bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
iKAGRA organization chart
iKAGRA subsystem member list is here.
Official Sensitivity of bKAGRA
Parameter list is here
KAGRA Official Documents
Others
Misc. (tools, past discussions, etc.)