Differences between revisions 24 and 206 (spanning 182 versions)
Revision 24 as of 2010-03-30 11:51:14
Size: 664
Comment:
Revision 206 as of 2012-04-09 14:41:42
Size: 3161
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
= LCGT wiki = = KAGRA wiki =
Line 3: Line 3:
[[LCGT/Meeting|打ち合わせ、定期ミーティングなど]] -----
== News ==
Line 5: Line 6:
[[LCGT/Meeting/Reviews/External|External Review]] April 17-20, 2012
Line 6: Line 8:
== LCGT組織 ==
[[LCGT/subgroup/list|組織図]]
----
=== Links ===
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/|JGWDoc]] <<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])||
Line 9: Line 13:
'''[[LCGT/subgroup|各作業部会]]'''  * [[LCGT/Meeting/EVOen|how to use EVO]]
 * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only)
 * [[LCGT/subgroup/howtojoin|Mailing lists]]
Line 11: Line 17:
----
=== Project time-line ===
Line 12: Line 20:
== LCGT Interface Control Document ==  * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
 * bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.
Line 14: Line 24:
[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|ICD on JGWdoc]] ----
=== iKAGRA organization chart ===

[[attachment:organization3.png|{{attachment:organization4.png|approved on Nov 2nd|width=300}}|width=300]]

 * iKAGRA subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].

----
=== Technical Details ===
 .[[LCGT/iLCGT/TD|iKAGRA TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bKAGRA TD wiki page]] (parameters, simulation codes, etc.)
[[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]]
 .[[LCGT/Terminology|Terminology]]

----
=== KAGRA Official Documents ===
 .[[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|KAGRA official sensitivity]]
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]]
 .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]])
 .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management Plan (SEMP)]]
Line 18: Line 47:
 .[[LCGT/Plans|SCHEDULES&TASKS]]
 .[[LCGT/Technical|TECHNICAL]]
 .[[LCGT/Links|LINKS]]
 .[[LCGT/HowTo|HOWTO]]


----
=== Past issues ===
 *[[LCGT/3month_study|2009年 3ヶ月study]]

 *[[LCGT/miscellaneous|misc.]]

 *[[LCGT/nao_archives|(OLD) NAO ARCHIVES]]

== Wiki How To ==
 * [[newusers|このwikiが初めての方へ]]
=== Others ===
 . [[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 . How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 . [[LCGT/old|Old wiki page]]
 . KAGRA webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]])

KAGRA wiki


News

External Review April 17-20, 2012


Meetings

KAGRA collaboration meeting
KAGRA f2f meeting
Chief Meeting
Reviews

Subsystem

iKAGRA wiki
bKAGRA wiki
advanced-study group wiki
KAGRA subsystem BLOG

Special WG

KAGRA Roadmap
RSE Roadmap
Bandwidth (~2009, LF, 22cm)
Instrument
SPI study (~2009)

Documents

JGWDoc
how to upload documents
SVN (How to use SVN)


Project time-line

  • Time-line chart is here (password protected).

  • iKAGRA stands for "initial KAGRA" which aims at the observation in the earlier stage with a simple configuration.
  • bKAGRA stands for "baseline KAGRA" which aims at the observation in 2017 and later with the full configuration.


iKAGRA organization chart

approved on Nov 2nd

  • iKAGRA subsystem member list is here.


Technical Details

latest sensitivity curve


KAGRA Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)