Differences between revisions 46 and 123 (spanning 77 versions)
Revision 46 as of 2010-06-03 13:55:33
Size: 1267
Comment:
Revision 123 as of 2010-11-08 13:20:27
Size: 2222
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 .[[LCGT/Meeting|打ち合わせ、定期ミーティングなど]]
 .[[LCGT/subgroup|各作業部会へのリンク]]
 .[[LCGT/PLUS|R&D計画:PLUS]]


=== LCGT組織 ===
 .[[attachment:LCGT/Meeting/weekly/minute/組織図100316.pdf|組織図]]


=== LCGT 公式文書 ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT designe document Ver3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]

=== Document server ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|JGW Doc]] ([[JGWDoc/HowTo/UpLoad|uploadの仕方]])

=== 文書検索 ===
 .[[http://www.google.com/coop/cse?cx=017444024272121679524:7p2pwvc2k2c|重力波検出グループに関する文書検索]]

=== 関連文書 ===
 .[[http://gw.icrr.u-tokyo.ac.jp/lcgt/|LCGT Home Page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/LCGT.html|LCGT meetingレポート集]]
 .[[LCGT/nao_archives|NAO ARCHIVES]]
Line 28: Line 5:
=== 技術面詳細 ===
 .[[LCGT/Technical|TECHNICAL]]
=== Links ===
||[[LCGT/Meeting| Meetings]]|| * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> * [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> * [[LCGT/Meeting/EVOen|how to use EVO]] || ||Subsystem || * [[LCGT/iLCGT|iLCGT wiki]] <<BR>> * [[LCGT/bLCGT|bLCGT wiki]] <<BR>> * [[LCGT/AIC|advanced-study group wiki]]||
||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||
Line 32: Line 10:
=== Project time-line and iLCGT organization charts ===
Line 33: Line 12:
=== Past issues ===
 .[[LCGT/3month_study|2009年 3ヶ月study]]
[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|{{attachment:timeline(pp).png|Subject to change|width=300}}|width=300]]
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]]

 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
Line 36: Line 19:
=== Technical Details ===
 .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
[[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]]
Line 37: Line 24:
=== othres ===
 .[[LCGT/miscellaneous|misc.]]
----
=== LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
Line 41: Line 30:
== Wiki How To ==
 .[[newusers|このwikiが初めての方へ]]
----
=== Others ===
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .[[newusers|How to use this wiki page]]
 .[[LCGT/old|Old wiki page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)

LCGT wiki


Meetings

* Biweekly LCGT meeting
* LCGT f2f meeting
* Chief Meeting
* how to use EVO

Subsystem

* iLCGT wiki
* bLCGT wiki
* advanced-study group wiki

Special WG

* LCGT Roadmap
* RSE Roadmap
* IFO Bandwidth (~2009)
* SPI study (~2009)

Documents

* public
* internal (password req.)
* how to upload documents


Project time-line and iLCGT organization charts

Subject to change approved on Nov 2nd

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)