Differences between revisions 76 and 126 (spanning 50 versions)
Revision 76 as of 2010-09-03 08:51:42
Size: 2026
Comment:
Revision 126 as of 2010-11-08 13:59:34
Size: 2223
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
 .[[LCGT/Meeting| Periodic Meetings, Working Group Meetings]]<<BR>>(定期ミーティング、各ワーキンググループの会議など)

  * [[LCGT/Meeting/f2f/2010Sept|LCGT face to face meeting]]: September 27-28, 2010 at [[http://www.icrr.u-tokyo.ac.jp/access/index_eng.html|ICRR Kashiwa campus]] 6F conference room
  * [[LCGT/Meeting/weekly|LCGT meeting]]: Every first and third Tuesday, 8:00JST~
  * [[LCGT/JGWC|JGWC]]: 2010/8/6 16:00~18:00
Line 9: Line 4:
=== LCGT Organization (LCGT組織) ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=121|LCGT Promoting Organization (LCGT推進組織)]]
 .[[LCGT/subgroup|Links to working groups(各作業部会へのリンク)]]

=== Links ===
||[[LCGT/Meeting| Meetings]]|| * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> * [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> * [[LCGT/Meeting/EVOen|how to use EVO]] || ||Subsystem || * [[LCGT/iLCGT|iLCGT wiki]] <<BR>> * [[LCGT/bLCGT|bLCGT wiki]] <<BR>> * [[LCGT/AIC|advanced-study group wiki]]||
||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||
Line 14: Line 10:
=== LCGT Official Documents (LCGT 公式文書) === === Project time-line ===

 * Time-line chart is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.

----
=== iLCGT organization chart ===

[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]]

----
=== Technical Details ===
 .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
[[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]]

----
=== LCGT Official Documents ===
Line 18: Line 32:
=== R&D ===
 .[[LCGT/PLUS|2010: R&D plan - PLUS]]
 .[[LCGT/3month_study|2009: 3ヶ月study]]
Line 23: Line 34:
=== Technical Details (技術面詳細) ===
 .[[LCGT/Technical|TECHNICAL]]


----
=== Document server ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|JGW Doc for public]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|JGW Doc for collaborators]] (internal documents, password required)

 .[[JGWDoc/HowTo/UpLoad|uploadの仕方]]

=== Document Search (文書検索 ) ===
 .[[http://www.google.com/coop/cse?cx=017444024272121679524:7p2pwvc2k2c|Document search for Japanese GW group (重力波検出グループに関する文書検索)]]

=== Related links (関連文書) ===
 .[[http://gw.icrr.u-tokyo.ac.jp/lcgt/|LCGT Home Page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/LCGT.html|LCGT meetingレポート集]]
 .[[LCGT/nao_archives|NAO ARCHIVES]]

----
=== othres ===
 .[[LCGT/miscellaneous|misc.]]


== Wiki How To ==
 .[[newusers|このwikiが初めての方へ]]
=== Others ===
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .[[newusers|How to use this wiki page]]
 .[[LCGT/old|Old wiki page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)

LCGT wiki


Meetings

* Biweekly LCGT meeting
* LCGT f2f meeting
* Chief Meeting
* how to use EVO

Subsystem

* iLCGT wiki
* bLCGT wiki
* advanced-study group wiki

Special WG

* LCGT Roadmap
* RSE Roadmap
* IFO Bandwidth (~2009)
* SPI study (~2009)

Documents

* public
* internal (password req.)
* how to upload documents


Project time-line

  • Time-line chart is here (password protected).

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


iLCGT organization chart

approved on Nov 2nd


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)