Differences between revisions 8 and 158 (spanning 150 versions)
Revision 8 as of 2009-03-04 23:58:09
Size: 765
Editor: whitehole
Comment:
Revision 158 as of 2011-05-01 03:52:13
Size: 2962
Comment:
Deletions are marked like this. Additions are marked like this.
Line 2: Line 2:
||[[LCGT|PROJECT]] ||[[LCGT/Meeting|MEETING]] ||[[LCGT/Plans|SCHEDULES&TASKS]] ||[[LCGT/Technical|TECHNICAL]] ||[[LCGT/Links|LINKS]] ||[[LCGT/HowTo|HOWTO]] ||
Line 4: Line 3:
== Project sub group ==
 *[[LCGT/subgroup/analysis|解析]]
 *[[LCGT/subgroup/vacuum|真空装置]]
 *[[LCGT/subgroup/ifo|干渉計]]
 *[[LCGT/subgroup/ioo|光学、入出力系]]
 *[[LCGT/subgroup/lowtemp|低温部]]
 *[[LCGT/subgroup/mine|坑内整備]]
 *[[LCGT/subgroup/infrastructure|インフラ]]
 *[[LCGT/subgroup/crust|基線伸縮系]]
-----
== News ==
Line 14: Line 6:
[[LCGT/subgroup/howtojoin|各サブグループへの参加の仕方]]  * LCGT international collaboration meeting on 5/10, 15:00 (JST)
 * [[LCGT/Meeting/Reviews#C|Program Advisory Board (Review C)]] will be held on June 21-22, 2011 at ICRR 6F.
Line 17: Line 10:
[[LCGT/3month_study|2009年 3ヶ月study]]
[[LCGT/todo|LCGT to do list]]
=== Links ===
||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|LCGT collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iLCGT wiki]] <<BR>> [[LCGT/bLCGT|bLCGT wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|LCGT subsystem BLOG]]||
||Special WG || [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> [[LCGT/subgroup/ifo/LCGT-LF|LCGT-LF]] || ||Documents || [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[LCGT/SVN|SVN]]||

 * [[LCGT/Meeting/EVOen|how to use EVO]]
 * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only)
 * [[LCGT/subgroup/howtojoin|Mailing lists]]
Line 21: Line 19:
== Wiki How To ==
 * [[newusers|このwikiが初めての方へ]]
=== Project time-line ===

 * Time-line chart is [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected).
 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.

----
=== iLCGT organization chart ===

[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=300}}|width=300]]

 * iLCGT subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]].
 * More detailed organization chart is [[xxx|here]] (TBA).

----
=== Technical Details ===
 .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
[[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]]
 .[[LCGT/Terminology|Terminology]]

----
=== LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]


----
=== Others ===
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]])
 .[[LCGT/old|Old wiki page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)

LCGT wiki


News


Meetings

LCGT collaboration meeting
LCGT f2f meeting
Chief Meeting
Reviews

Subsystem

iLCGT wiki
bLCGT wiki
advanced-study group wiki
LCGT subsystem BLOG

Special WG

LCGT Roadmap
RSE Roadmap
IFO Bandwidth (~2009)
SPI study (~2009)
LCGT-LF

Documents

public
internal (password req.)
how to upload documents
SVN


Project time-line

  • Time-line chart is here (password protected).

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


iLCGT organization chart

approved on Nov 2nd

  • iLCGT subsystem member list is here.

  • More detailed organization chart is here (TBA).


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)