Differences between revisions 89 and 121 (spanning 32 versions)
Revision 89 as of 2010-11-03 15:27:07
Size: 1825
Comment:
Revision 121 as of 2010-11-08 13:13:02
Size: 2217
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
Now this wiki page is under construction.
Old website is [[LCGT/old| here]].
Line 6: Line 3:
=== news === ----
Line 8: Line 5:
 * The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
 * LCGT Roadmap meeting has started.
=== Links ===
||[[LCGT/Meeting| Meetings]]|| * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> * [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> * [[LCGT/Meeting/EVOen|EVO usage]] || ||Subsystem || * [[LCGT/iLCGT|iLCGT wiki]] <<BR>> * [[LCGT/bLCGT|bLCGT wiki]] <<BR>> * [[LCGT/AIC|advanced-study group wiki]]||
||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] ||
Line 11: Line 9:
----
Line 13: Line 12:
[[attachment:timeline.png|{{attachment:timeline.png|Subject to change|width=300}}|width=300]]
[[attachment:organization.png|{{attachment:organization.png|approved on Nov 2nd|width=200}}|width=200]]
[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|{{attachment:timeline(pp).png|Subject to change|width=300}}|width=300]]
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=200}}|width=200]]
Line 16: Line 15:
 * iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.  * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
Line 19: Line 18:
----
=== Technical Details ===
 .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
[[attachment:sensitivity.png|{{attachment:sensitivity.png|latest sensitivity curve|width=400}}|width=400]]
Line 20: Line 24:
=== Links ===
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|Subsystems]] ||
||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|How to upload]] ||
----
=== LCGT Official Documents ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]
Line 26: Line 31:
=== LCGT Official Documents (LCGT 公式文書) ===
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]]
 .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]]

=== R&D ===
 .[[LCGT/PLUS|2010: R&D plan - PLUS]]
 .[[LCGT/3month_study|2009: 3ヶ月study]]

----
=== Technical Details (技術面詳細) ===
 .[[LCGT/Technical|TECHNICAL]]

 .[[LCGT/Terminology|Terminology]]

----
=== othres ===
 .[[LCGT/miscellaneous|misc.]]


== Wiki How To ==
 .[[newusers|このwikiが初めての方へ]]
=== Others ===
 .[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.)
 .[[newusers|How to use this wiki page]]
 .[[LCGT/old|Old wiki page]]
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)

LCGT wiki


Meetings

* Biweekly LCGT meeting
* LCGT f2f meeting
* Chief Meeting
* EVO usage

Subsystem

* iLCGT wiki
* bLCGT wiki
* advanced-study group wiki

Special WG

* LCGT Roadmap
* RSE Roadmap
* IFO Bandwidth (~2009)
* SPI study (~2009)

Documents

* public
* internal (password req.)
* how to upload documents


Project time-line and iLCGT organization charts

Subject to change approved on Nov 2nd

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)