Differences between revisions 98 and 122 (spanning 24 versions)
Revision 98 as of 2010-11-03 16:13:26
Size: 1929
Comment:
Revision 122 as of 2010-11-08 13:13:29
Size: 2222
Comment:
Deletions are marked like this. Additions are marked like this.
Line 3: Line 3:
=== news ===

 * The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus.
 * LCGT Roadmap meeting has started.

=== Project time-line and iLCGT organization charts ===

[[attachment:timeline.png|{{attachment:timeline.png|Subject to change|width=300}}|width=300]]
[[attachment:organization.png|{{attachment:organization.png|approved on Nov 2nd|width=200}}|width=200]]

 * iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
----
Line 18: Line 6:
||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|iLCGT subsystem wiki]] || ||[[LCGT/Meeting| Meetings]]|| * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] <<BR>> * [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> * [[LCGT/Meeting/EVOen|how to use EVO]] || ||Subsystem || * [[LCGT/iLCGT|iLCGT wiki]] <<BR>> * [[LCGT/bLCGT|bLCGT wiki]] <<BR>> * [[LCGT/AIC|advanced-study group wiki]]||
Line 22: Line 10:
=== Project time-line and iLCGT organization charts ===

[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|{{attachment:timeline(pp).png|Subject to change|width=300}}|width=300]]
[[attachment:organization2.png|{{attachment:organization2.png|approved on Nov 2nd|width=200}}|width=200]]

 * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
 * bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.

----
Line 23: Line 20:
 .[[LCGT/Technical|TECHNICAL]] (parameters, simulation codes, etc.)  .[[LCGT/iLCGT/TD|iLCGT TD wiki page]] (parameters, simulation codes, etc.)
 .[[LCGT/bLCGT/TD|bLCGT TD wiki page]] (parameters, simulation codes, etc.)
Line 37: Line 35:
 .[[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/lcgt2010j.html|LCGT website]] (in Japanese)

LCGT wiki


Meetings

* Biweekly LCGT meeting
* LCGT f2f meeting
* Chief Meeting
* how to use EVO

Subsystem

* iLCGT wiki
* bLCGT wiki
* advanced-study group wiki

Special WG

* LCGT Roadmap
* RSE Roadmap
* IFO Bandwidth (~2009)
* SPI study (~2009)

Documents

* public
* internal (password req.)
* how to upload documents


Project time-line and iLCGT organization charts

Subject to change approved on Nov 2nd

  • iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
  • bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.


Technical Details

latest sensitivity curve


LCGT Official Documents


Others

LCGT (last edited 2012-06-05 12:35:19 by OsamuMiyakawa)