Line 1: | Line 1: |
= LCGT wiki = | = KAGRA wiki = |
Line 3: | Line 3: |
=== news === | ----- == News == |
Line 5: | Line 6: |
* The next face-to-face meeting is on Feb 4-5th at Kashiwa Campus. * LCGT Roadmap meeting has started. |
[[LCGT/Meeting/f2f/2012Feb|KAGRA f2f Meeting]] 2012.2.2-4 |
Line 8: | Line 8: |
=== Project time-line and iLCGT organization charts === | ---- === Links === ||[[LCGT/Meeting| Meetings]]||[[LCGT/Meeting/weekly|KAGRA collaboration meeting]] <<BR>> [[LCGT/Meeting/f2f/Top|KAGRA f2f meeting]] <<BR>> [[LCGT/Meeting/Leader|Chief Meeting]] <<BR>> [[LCGT/Meeting/Reviews|Reviews]] || ||Subsystem || [[LCGT/iLCGT|iKAGRA wiki]] <<BR>> [[LCGT/bLCGT|bKAGRA wiki]] <<BR>> [[LCGT/AIC|advanced-study group wiki]] <<BR>> [[http://gwclio.icrr.u-tokyo.ac.jp/lcgtsubgroup/|KAGRA subsystem BLOG]]|| ||Special WG || [[LCGT/Meeting/RoadMap|KAGRA Roadmap]]<<BR>> [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> Bandwidth ([[LCGT/subgroup/ifo/BW|~2009]], [[LCGT/subgroup/ifo/LCGT-LF|LF]], [[LCGT/subgroup/ifo/BW2|22cm]]) <<BR>>[[LCGT/Meeting/Instrument|Instrument]]<<BR>> [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] <<BR>> || ||Documents || [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> [[JGWDoc/HowTo/UpLoad|how to upload documents]]<<BR>> [[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/|SVN]] ([[LCGT/SVN|How to use SVN]])|| |
Line 10: | Line 13: |
[[attachment:timeline.png|{{attachment:timeline.png|Subject to change|width=300}}|width=300]] [[attachment:organization.png|{{attachment:organization.png|approved on Nov 2nd|width=200}}|width=200]] |
* [[LCGT/Meeting/EVOen|how to use EVO]] * [[http://www.icrr.u-tokyo.ac.jp/gr/lcgt/forresearcherj/forresearcherj.html|tools for meetings]] (Japanese only) * [[LCGT/subgroup/howtojoin|Mailing lists]] |
Line 13: | Line 17: |
* iLCGT stands for "initial LCGT" which aims at the observation in 2014 with a simple configuration. | ---- === Project time-line === * Time-line chart is [[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=236|here|width=300]] (password protected). * iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration. |
Line 16: | Line 24: |
---- === iKAGRA organization chart === |
|
Line 17: | Line 27: |
=== Links === ||[[LCGT/Meeting| Meetings]] || * [[LCGT/Meeting/weekly|Biweekly LCGT meeting]] <<BR>> * [[LCGT/Meeting/f2f/Top|LCGT f2f meeting]] || ||Subsystem || [[LCGT/subgroup|iLCGT subsystem wiki]] || ||Special WG || * [[LCGT/Meeting/RoadMap|LCGT Roadmap]]<<BR>> * [[LCGT/subgroup/ifo/RSERoadMap|RSE Roadmap]] <<BR>> * [[LCGT/subgroup/ifo/BW|IFO Bandwidth (~2009)]] <<BR>> * [[LCGT/subgroup/ifo/SPI|SPI study (~2009)]] || ||Documents || * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/DocumentDatabase|public]] <<BR>> * [[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/DocumentDatabase|internal (password req.)]]<<BR>> * [[JGWDoc/HowTo/UpLoad|how to upload documents]] || |
[[attachment:organization3.png|{{attachment:organization3.png|approved on Nov 2nd|width=300}}|width=300]] * iKAGRA subsystem member list is [[LCGT/iLCGT/Subgroup/Members|here]]. * More detailed organization chart is [[xxx|here]] (TBA). |
Line 23: | Line 34: |
.[[LCGT/Technical|TECHNICAL]] (parameters, simulation codes, etc.) | .[[LCGT/iLCGT/TD|iKAGRA TD wiki page]] (parameters, simulation codes, etc.) .[[LCGT/bLCGT/TD|bKAGRA TD wiki page]] (parameters, simulation codes, etc.) |
Line 25: | Line 37: |
.[[LCGT/Terminology|Terminology]] | |
Line 27: | Line 40: |
=== LCGT Official Documents === .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|LCGT design document Ver 3.0]] .[[http://gw.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|Interface Control Document (ICD)]] |
=== KAGRA Official Documents === .[[http://gwcenter.icrr.u-tokyo.ac.jp/en/researcher/parameter|KAGRA official sensitivity]] .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=30|KAGRA design document Ver 3.0]] .[[https://granite.phys.s.u-tokyo.ac.jp/svn/LCGT/trunk/ICD|Interface Control Document (ICD)]] ([[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/DocDB/ShowDocument?docid=18|old ICD]]) .[[http://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=465|System Engineering Management Plan (SEMP)]] |
Line 34: | Line 49: |
.[[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.) .[[newusers|How to use this wiki page]] .[[LCGT/old|Old wiki page]] |
. [[LCGT/miscellaneous|Misc.]] (tools, past discussions, etc.) . How to use this wiki page for a new user([[NewUsersE|English]]/[[newusers|Japanese]]) . [[LCGT/old|Old wiki page]] . KAGRA webs site ([[http://gwcenter.icrr.u-tokyo.ac.jp/|Japanese]], [[http://gwcenter.icrr.u-tokyo.ac.jp/en/|English]]) |
KAGRA wiki
News
KAGRA f2f Meeting 2012.2.2-4
Links
KAGRA collaboration meeting |
|
Subsystem |
iKAGRA wiki |
|
Special WG |
KAGRA Roadmap |
|
Documents |
public |
tools for meetings (Japanese only)
Project time-line
Time-line chart is here (password protected).
- iLCGT stands for "initial LCGT" which aims at the observation in the earlier stage with a simple configuration.
- bLCGT stands for "baseline LCGT" which aims at the observation in 2017 and later with the full configuration.
iKAGRA organization chart
Technical Details
iKAGRA TD wiki page (parameters, simulation codes, etc.)
bKAGRA TD wiki page (parameters, simulation codes, etc.)