Next Project

Design

  • Electrical connection changed
  • Design will be fix by the next week
  • About having oplev and tilt sensor at the same time on one set of pylons - Additional time to investigate necessary
  • At least MCE will have both oplev and tiltsens at the same time
  • We will design and make a light wind-sheild
  • MCO and MCI configuration? Can two sensors be installed at the same time? Keiko will send a picture and Junegyu will check how we can have them
  • Can oplev QPD and tilt sensor be mounted together - probably difficult.
  • KK will talk to Miyazawa-san about his question of the channel numbers.

Fabrication

  • A small company Kyuman knows can manufacture the sets of tiltsensors for 1.5 Myen.
  • Seiji will ask if we can buy things from non-Japanese company
  • 3 sensors for 3 mirrors. No spare. The prototype one we used last time can be reserved as a spare.

Schedule

— fabrication —

  • Kyuman thinks we can start ordering as soon as the design is fixed
  • Kyuman and the company together to transfer the technique, which will take some time.
  • Deliver time will be in the end of August.

— installation - -

  • Sometime in October.
  • Kyuman can stay for a week, Junegyu can stay for 3 weeks in total.

— people —

  • We will find maybe one student (shift call or what?)
  • Kirii-kun won’t be able to help due to his master thesis work

Paper

  • 5 Hz noise? We could test with also MCI, MCO to see if the other suspensions have the peak or not
  • Kokeyama will ask Nakano-kun about the co-author (Nakano and Kambara?)
  • Aim to have a first deadline by the end of April (Junegyu’s deadline 23rd on the experimental part)

Other

  • Seiji is visiting Sogang university in May.