Size: 3605
Comment:
|
Size: 3619
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 16: | Line 16: |
|| レーザー再調整 || 日本レーザー || [[http://gw.icrr.u-tokyo.ac.jp:8888/clio_blog/2009/02/post-6.html|blog 090202]] || | || レーザー再調整 || 日本レーザー || [[http://gw.icrr.u-tokyo.ac.jp:8888/clio_blog/2009/02/post-6.html|blog 090202]] || 2009/02/02 || |
Period
January 2009 - March 2009
Top-priority
- 低温化準備作業
- 低温時 noise budget 作成作業
Main Tasks
Task Name |
Responsible |
STATUS |
due |
不調なレーザーをなだめようと MC 制御など改造 |
三代木、宮川 |
どれも感度復旧には至らず |
2009/03/End |
レーザー再調整 |
日本レーザー |
2009/02/02 |
|
実験室の冷却 |
三代木 |
|
2008/12/End |
レーザーの排熱 |
三代木、内山 |
|
2008/12/End |
レーザーブースのクリーン化 |
三代木 |
|
2008/12/End |
Small Tasks & Schedules
Task Name |
Responsible |
STATUS |
due |
内山 |
50% LSPI by Telada |
2009/09/End |
|
辰巳 |
10% |
2009/07/End |
|
RF intensity noise investigation |
我妻 |
|
|
宮川 |
50% shopping + shipping |
2009/09/End |
|
内山 |
75% @ 2009/06/15 |
2009/09/End |
|
三代木 |
90% Inline End was done @ 2009/06/15 |
2009/06/End |
|
辰巳 |
not yet installed |
2009/03/End |
|
辰巳 |
Done |
2009/03/End |
|
新井 |
design due: 2009/01/08, deliver due 2009/01/End, preparation ends 2009/02/06 |
2009/03/End |
Pending Tasks
Task Name |
Responsible |
COMMENTS |
BS pendulum modification |
三代木 |
|
ST pendulum modification |
三代木 |
|
寺田 |
|
|
MC WFS and beam orientation control |
我妻 |
|
Arm cavity WFS or dithering |
我妻 |
優先度:高 Dithering 相当のシステムを早急に構築する必要あり。 |
Main suspension Y-stage installation |
内山 |
|
辰巳 |
コイルアクチュエイター効率の低減 |
|
Up-conversion noise investigation |
新井 |
|
Shadow sensor |
辰巳、高橋 |
|
Past small Tasks
Task Name |
Responsible |
STATUS |
due |