Describe CLIO/Tasks here. | Update: <<DateTime(2009-06-27T02:33:38+0900)>> == Small Tasks & Schedules == || Task Name || Responsible || STATUS || due || || * [[CLIO/Tasks/CoilBobbin|コイルボビン]] ||(担当:内山) || 75% @ 2009/06/15 / || 2009/09/End || || * [[CLIO/Tasks/EndLight|エンド光]] ||(担当:三代木)|| 90% Inline End was done @ 2009/06/15 || 2009/06/End || || * [[CLIO/Tasks/DigitalControl|デジタル化 1st phase]] ||(担当:宮川)|| 50% shopping + shipping || 2009/9/End || || * [[CLIO/Tasks/Damping|ダンピング]] ||(担当:内山)|| 50% LSPI by Telada || 2009/9/End || || * [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定]] ||(担当:鈴木敏)|| 20% || 2009/9/End || || * [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] ||(担当:辰巳)|| 10% || 2009/7/End || || * RF intensity noise investigation ||(担当:我妻)|| || || || * BS pendulum modification ||(担当:三代木)|| Design || || || * ST pendulum modification ||(担当:三代木)|| Parts Ordered || || || * [[CLIO/Tasks/Target|ターゲット板]] || (担当:宮川)|| 10% || 2009/8/End || == Pending Tasks == * [[CLIO/Tasks/RecoilMass|リコイル・マス (担当:寺田)]] * MC WFS and beam orientation control (担当:我妻) * Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。 * Main suspension Y-stage installation (担当:内山) * [[CLIO/Tasks/CoilDriver|アクチュエイター雑音低減・第2段(担当:辰巳) コイルアクチュエイター効率の低減]] * Up-conversion noise investigation (担当:新井) * Shadow sensor (担当:辰巳、高橋) == Past small Tasks == * [[CLIO/Tasks/DigitalControl/AnalogFrontEnd|デジタル化アナログフロントエンド・第1段]](担当:辰巳) due: 2009/3/End * [[CLIO/Tasks/CoilDriver|アクチュエイター雑音低減・第1段]] (担当:辰巳) due: 2009/3/End * [[CLIO/Tasks/Done/BeamCenterJig|粗調ビームセンターリング]] (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6 ---- ||[[CLIO|CLIO wiki Top]]||[[LCGT|LCGT wiki Top]]|| |
Update: 2009-06-27 02:33:38
Small Tasks & Schedules
Task Name |
Responsible |
STATUS |
due |
* コイルボビン |
(担当:内山) |
75% @ 2009/06/15 / |
2009/09/End |
* エンド光 |
(担当:三代木) |
90% Inline End was done @ 2009/06/15 |
2009/06/End |
(担当:宮川) |
50% shopping + shipping |
2009/9/End |
|
* ダンピング |
(担当:内山) |
50% LSPI by Telada |
2009/9/End |
(担当:鈴木敏) |
20% |
2009/9/End |
|
(担当:辰巳) |
10% |
2009/7/End |
|
* RF intensity noise investigation |
(担当:我妻) |
|
|
* BS pendulum modification |
(担当:三代木) |
Design |
|
* ST pendulum modification |
(担当:三代木) |
Parts Ordered |
|
* ターゲット板 |
(担当:宮川) |
10% |
2009/8/End |
Pending Tasks
- MC WFS and beam orientation control (担当:我妻)
- Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。
- Main suspension Y-stage installation (担当:内山)
- Up-conversion noise investigation (担当:新井)
- Shadow sensor (担当:辰巳、高橋)
Past small Tasks
デジタル化アナログフロントエンド・第1段(担当:辰巳) due: 2009/3/End
アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End
粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6