 * [[CLIO/Tasks/CoilBobbin|コイルボビン]] (担当:内山) 75% done @ 2009/06/15 / due: 2009/09/End
* [[CLIO/Tasks/EndLight|エンド光]] (担当:三代木) 50% done @ 2009/06/15 due: 2009/06/End
* [[CLIO/Tasks/DigitalControl|デジタル化 (担当:宮川) 1st phase due: 2009/7/End]]
* [[CLIO/Tasks/Damping|ダンピング (担当:内山)]]
* [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定 (担当:鈴木))]]
* [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] (担当:辰巳)
* RF intensity noise investigation (担当:我妻)
* BS pendulum modification (担当:三代木) start:2009/06
* ST pendulum modification (担当:三代木) start:2009/06
* [[CLIO/Tasks/Target/|ターゲット板]]
|| Task Name || Responsible || START || STATUS || DUE ||
||
* [[CLIO/Tasks/CoilBobbin|コイルボビン]]    ||(担当:内山) || 75% done @ 2009/06/15 / due: 2009/09/End ||
||
* [[CLIO/Tasks/EndLight|エンド光]]         ||(担当:三代木)|| Inline End 80% done @ 2009/06/15 due: 2009/06/End ||
||
* [[CLIO/Tasks/DigitalControl|デジタル化]] ||(担当:宮川)|| 1st phase due: 2009/9/End ||
||
* [[CLIO/Tasks/Damping|ダンピング]] ||(担当:内山)|| ||
||
* [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定]] ||(担当:鈴木敏)|| ||
||
* [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] ||(担当:辰巳)|| ||
||
* RF intensity noise investigation ||(担当:我妻)|| ||
||
* BS pendulum modification ||(担当:三代木)|| start:2009/06 ||
||
* ST pendulum modification ||(担当:三代木)|| start:2009/06 ||
||
* [[CLIO/Tasks/Target|ターゲット板]] || (担当:宮川)|| start:2009/05 ||
Line 27: Line 28:
 * [[CLIO/Tasks/BeamCenterJig|粗調ビームセンターリング]] (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6
 * [[CLIO/Tasks/Done]]
 * [[CLIO/Tasks/Done/BeamCenterJig|粗調ビームセンターリング]] (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6
Line 31: Line 31:
||[[CLIO|CLIO wiki Top]]||[[LCGT|LCGT wiki Top]]||. ||[[CLIO|CLIO wiki Top]]||[[LCGT|LCGT wiki Top]]||

Update: 2009-06-27 02:33:38

Small Tasks & Schedules

Task Name

Responsible

START

STATUS

DUE

* コイルボビン

(担当:内山)

75% done @ 2009/06/15 / due: 2009/09/End

* エンド光

(担当:三代木)

Inline End 80% done @ 2009/06/15 due: 2009/06/End

* デジタル化

(担当:宮川)

1st phase due: 2009/9/End

* ダンピング

(担当:内山)

* 純アルミ線Q値測定

(担当:鈴木敏)

* デジタル化アナログフロントエンド・第2段

(担当:辰巳)

* RF intensity noise investigation

(担当:我妻)

* BS pendulum modification

(担当:三代木)

start:2009/06

* ST pendulum modification

(担当:三代木)

start:2009/06

* ターゲット板

(担当:宮川)

start:2009/05