2067
Comment:
|
2189
|
Deletions are marked like this. | Additions are marked like this. |
Line 4: | Line 4: |
|| * [[CLIO/Tasks/CoilBobbin|コイルボビン]] ||(担当:内山) 75% done @ 2009/06/15 / due: 2009/09/End || || * [[CLIO/Tasks/EndLight|エンド光]] ||(担当:三代木) Inline End 80% done @ 2009/06/15 due: 2009/06/End || || * [[CLIO/Tasks/DigitalControl|デジタル化]] ||(担当:宮川) 1st phase due: 2009/9/End || || * [[CLIO/Tasks/Damping|ダンピング]] ||(担当:内山) || || * [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定]] ||(担当:鈴木敏) || || * [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] || (担当:辰巳) || || * RF intensity noise investigation ||(担当:我妻) || || * BS pendulum modification ||(担当:三代木) start:2009/06 || || * ST pendulum modification ||(担当:三代木) start:2009/06 || || * [[CLIO/Tasks/Target|ターゲット板]] || (担当:宮川) || |
|| Task Name || Responsible || START || STATUS || DUE || || * [[CLIO/Tasks/CoilBobbin|コイルボビン]] ||(担当:内山) || 75% done @ 2009/06/15 / due: 2009/09/End || || * [[CLIO/Tasks/EndLight|エンド光]] ||(担当:三代木)|| Inline End 80% done @ 2009/06/15 due: 2009/06/End || || * [[CLIO/Tasks/DigitalControl|デジタル化]] ||(担当:宮川)|| 1st phase due: 2009/9/End || || * [[CLIO/Tasks/Damping|ダンピング]] ||(担当:内山)|| || || * [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定]] ||(担当:鈴木敏)|| || || * [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] ||(担当:辰巳)|| || || * RF intensity noise investigation ||(担当:我妻)|| || || * BS pendulum modification ||(担当:三代木)|| start:2009/06 || || * ST pendulum modification ||(担当:三代木)|| start:2009/06 || || * [[CLIO/Tasks/Target|ターゲット板]] || (担当:宮川)|| start:2009/05 || |
Update: 2009-06-27 02:33:38
Small Tasks & Schedules
Task Name |
Responsible |
START |
STATUS |
DUE |
* コイルボビン |
(担当:内山) |
75% done @ 2009/06/15 / due: 2009/09/End |
||
* エンド光 |
(担当:三代木) |
Inline End 80% done @ 2009/06/15 due: 2009/06/End |
||
* デジタル化 |
(担当:宮川) |
1st phase due: 2009/9/End |
||
* ダンピング |
(担当:内山) |
|
||
(担当:鈴木敏) |
|
|||
(担当:辰巳) |
|
|||
* RF intensity noise investigation |
(担当:我妻) |
|
||
* BS pendulum modification |
(担当:三代木) |
start:2009/06 |
||
* ST pendulum modification |
(担当:三代木) |
start:2009/06 |
||
* ターゲット板 |
(担当:宮川) |
start:2009/05 |
Pending Tasks
- MC WFS and beam orientation control (担当:我妻)
- Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。
- Main suspension Y-stage installation (担当:内山)
- Up-conversion noise investigation (担当:新井)
- Shadow sensor (担当:辰巳、高橋)
Past small Tasks
デジタル化アナログフロントエンド・第1段(担当:辰巳) due: 2009/3/End
アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End
粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6