Line 8: Line 8:
|| [[CLIO/Tasks/CoilBobbin|コイルボビン]] ||内山 || 75% @ 2009/06/15 || 2009/09/End ||
|| [[CLIO/Tasks/EndLight|エンド光]] ||三代木|| 90% Inline End was done @ 2009/06/15 || 2009/06/End ||
|| [[CLIO/Tasks/DigitalControl|デジタル化 1st phase]] ||宮川|| 50% shopping + shipping || 2009/9/End ||
|| [[CLIO/Tasks/Damping|ダンピング]] ||内山|| 50% LSPI by Telada || 2009/9/End ||
|| [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定]] ||鈴木敏|| 20% || 2009/9/End ||
|| [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] ||辰巳|| 10% || 2009/7/End ||
|| RF intensity noise investigation ||我妻|| || ||
|| BS pendulum modification ||三代木|| Under Design || ||
|| ST pendulum modification ||三代木|| Parts Ordered || ||
|| [[CLIO/Tasks/Target|ターゲット板]] ||宮川|| 10% || 2009/8/End ||
|| [[CLIO/Tasks/CoilBobbin|コイルボビン]] || 内山 || 75% @ 2009/06/15 || 2009/09/End ||
|| [[CLIO/Tasks/EndLight|エンド光]] || 三代木 || 90% Inline End was done @ 2009/06/15 || 2009/06/End ||
|| [[CLIO/Tasks/DigitalControl|デジタル化 1st phase]] || 宮川 || 50% shopping + shipping || 2009/9/End ||
|| [[CLIO/Tasks/Damping|ダンピング]] || 内山 || 50% LSPI by Telada || 2009/9/End ||
|| [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定]] || 鈴木敏 || 20% || 2009/9/End ||
|| [[CLIO/Tasks/DigitalControl/AnalogFrontEnd2|デジタル化アナログフロントエンド・第2段]] || 辰巳 || 10% || 2009/7/End ||
|| RF intensity noise investigation || 我妻 || || ||
|| BS pendulum modification || 三代木 || Under Design || ||
|| ST pendulum modification || 三代木 || Parts Ordered || ||
|| [[CLIO/Tasks/Target|ターゲット板]] || 宮川 || 10% || 2009/8/End ||
Line 20: Line 20:
|| '''Task Name''' || '''Responsible'''   || '''STATUS''' || '''due''' ||
|| [[CLIO/Tasks/RecoilMass|リコイル・マス (担当:寺田)]] ||
|| MC WFS and beam orientation control (担当:我妻) ||
|| Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。 ||
|| Main suspension Y-stage installation (担当:内山) ||
|| [[CLIO/Tasks/CoilDriver|アクチュエイター雑音低減・第2段(担当:辰巳) コイルアクチュエイター効率の低減]] ||
|| Up-conversion noise investigation (担当:新井) ||
|| Shadow sensor (担当:辰巳、高橋) ||
|| '''Task Name''' || '''Responsible'''   || '''COMMENTS''' ||
|| [[CLIO/Tasks/RecoilMass|リコイル・マス]] || 寺田     || ||
|| MC WFS and beam orientation control   || 我妻     || ||
|| Arm cavity WFS or dithering           || 我妻     || 優先度:高Dithering 相当のシステムを早急に構築する必要あり。 ||
|| Main suspension Y-stage installation  || 内山     || ||
|| [[CLIO/Tasks/CoilDriver|アクチュエイター雑音低減・第2段]] || 辰巳 || コイルアクチュエイター効率の低減 ||
|| Up-conversion noise investigation     || 新井     || ||
|| Shadow sensor                         || 辰巳、高橋 || ||

/Meeting

/Plans

/Tasks

/Technicals

/SiteInfo

FindPage   

TitleIndex

WordIndex

HelpOnMoinWikiSyntax

Update: 2009-06-27 02:33:38

Small Tasks & Schedules

Task Name

Responsible  

STATUS

due

コイルボビン

内山

75% @ 2009/06/15

2009/09/End

エンド光

三代木

90% Inline End was done @ 2009/06/15

2009/06/End

デジタル化 1st phase

宮川

50% shopping + shipping

2009/9/End

ダンピング

内山

50% LSPI by Telada

2009/9/End

純アルミ線Q値測定

鈴木敏

20%

2009/9/End

デジタル化アナログフロントエンド・第2段

辰巳

10%

2009/7/End

RF intensity noise investigation

我妻

BS pendulum modification

三代木

Under Design

ST pendulum modification

三代木

Parts Ordered

ターゲット板

宮川

10%

2009/8/End

Pending Tasks

Task Name

Responsible  

COMMENTS

リコイル・マス

寺田

MC WFS and beam orientation control

我妻

Arm cavity WFS or dithering

我妻

優先度:高Dithering 相当のシステムを早急に構築する必要あり。

Main suspension Y-stage installation

内山

アクチュエイター雑音低減・第2段

辰巳

コイルアクチュエイター効率の低減

Up-conversion noise investigation

新井

Shadow sensor

辰巳、高橋