Small Tasks & Schedules
Task Name |
Responsible |
STATUS |
due |
内山 |
75% @ 2009/06/15 |
2009/09/End |
|
三代木 |
90% Inline End was done @ 2009/06/15 |
2009/06/End |
|
宮川 |
50% shopping + shipping |
2009/9/End |
|
内山 |
50% LSPI by Telada |
2009/9/End |
|
鈴木敏 |
20% |
2009/9/End |
|
辰巳 |
10% |
2009/7/End |
|
RF intensity noise investigation |
我妻 |
|
|
BS pendulum modification |
三代木 |
Under Design |
|
ST pendulum modification |
三代木 |
Parts Ordered |
|
宮川 |
10% |
2009/8/End |
Pending Tasks
Task Name |
Responsible |
COMMENTS |
寺田 |
|
|
MC WFS and beam orientation control |
我妻 |
|
Arm cavity WFS or dithering |
我妻 |
優先度:高 Dithering 相当のシステムを早急に構築する必要あり。 |
Main suspension Y-stage installation |
内山 |
|
辰巳 |
コイルアクチュエイター効率の低減 |
|
Up-conversion noise investigation |
新井 |
|
Shadow sensor |
辰巳、高橋 |
|
Past small Tasks
デジタル化アナログフロントエンド・第1段(担当:辰巳) due: 2009/3/End
アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End
粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6