Size: 1969
Comment:
|
Size: 1956
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 5: | Line 5: |
* [[CLIO/Tasks/EndLight|エンド光]] (担当:三代木) 50% done @ 2009/06/15 due: 2009/06/End * [[CLIO/Tasks/DigitalControl|デジタル化 (担当:宮川) 1st phase due: 2009/7/End]] |
* [[CLIO/Tasks/EndLight|エンド光]] (担当:三代木) Inline End 80% done @ 2009/06/15 due: 2009/06/End * [[CLIO/Tasks/DigitalControl|デジタル化]] (担当:宮川) 1st phase due: 2009/9/End |
Line 8: | Line 8: |
* [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定 (担当:鈴木(敏))]] | * [[CLIO/Tasks/AlWireQ|純アルミ線Q値測定 (担当:鈴木敏)]] |
Line 13: | Line 13: |
* [[CLIO/Tasks/Target/|ターゲット板]] | * [[CLIO/Tasks/Target|ターゲット板]] |
Line 27: | Line 27: |
* [[CLIO/Tasks/BeamCenter|粗調ビームセンターリング]] (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6 * [[CLIO/Tasks/Done]] |
* [[CLIO/Tasks/Done/BeamCenterJig|粗調ビームセンターリング]] (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6 |
Line 31: | Line 30: |
||[[CLIO|CLIO wiki Top]]||[[LCGT|LCGT wiki Top]]||. | ||[[CLIO|CLIO wiki Top]]||[[LCGT|LCGT wiki Top]]|| |
Update: 2009-06-27 02:33:38
Small Tasks & Schedules
コイルボビン (担当:内山) 75% done @ 2009/06/15 / due: 2009/09/End
エンド光 (担当:三代木) Inline End 80% done @ 2009/06/15 due: 2009/06/End
デジタル化 (担当:宮川) 1st phase due: 2009/9/End
デジタル化アナログフロントエンド・第2段 (担当:辰巳)
- RF intensity noise investigation (担当:我妻)
- BS pendulum modification (担当:三代木) start:2009/06
- ST pendulum modification (担当:三代木) start:2009/06
Pending Tasks
- MC WFS and beam orientation control (担当:我妻)
- Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。
- Main suspension Y-stage installation (担当:内山)
- Up-conversion noise investigation (担当:新井)
- Shadow sensor (担当:辰巳、高橋)
Past small Tasks
デジタル化アナログフロントエンド・第1段(担当:辰巳) due: 2009/3/End
アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End
粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6