Update: 2009-06-27 02:33:38
Small Tasks & Schedules
Task Name |
Responsible |
STATUS |
due |
内山 |
75% @ 2009/06/15 |
2009/09/End |
|
三代木 |
90% Inline End was done @ 2009/06/15 |
2009/06/End |
|
宮川 |
50% shopping + shipping |
2009/9/End |
|
内山 |
50% LSPI by Telada |
2009/9/End |
|
鈴木敏 |
20% |
2009/9/End |
|
辰巳 |
10% |
2009/7/End |
|
RF intensity noise investigation |
我妻 |
|
|
BS pendulum modification |
三代木 |
Under Design |
|
ST pendulum modification |
三代木 |
Parts Ordered |
|
宮川 |
10% |
2009/8/End |
Pending Tasks
Task Name |
Responsible |
STATUS |
due |
MC WFS and beam orientation control (担当:我妻) |
|||
Arm cavity WFS or dithering (担当:我妻) 優先度:高Dithering 相当のシステムを早急に構築する必要あり。 |
|||
Main suspension Y-stage installation (担当:内山) |
|||
Up-conversion noise investigation (担当:新井) |
|||
Shadow sensor (担当:辰巳、高橋) |
Past small Tasks
デジタル化アナログフロントエンド・第1段(担当:辰巳) due: 2009/3/End
アクチュエイター雑音低減・第1段 (担当:辰巳) due: 2009/3/End
粗調ビームセンターリング (担当:新井) design due: 2009/1/8, deliver due 2009/1/End, preparation ends 2009/2/6