Differences between revisions 22 and 25 (spanning 3 versions)
Revision 22 as of 2018-03-08 10:16:53
Size: 2115
Comment:
Revision 25 as of 2018-05-24 11:20:01
Size: 2317
Comment:
Deletions are marked like this. Additions are marked like this.
Line 50: Line 50:
 * [[/CheckList/20180307_VacuumETMX|Vacuum start at ETMX]] (2018/3/7)  * [[/CheckList/20180307_VacuumETMX|Vacuum start at ETMX]] (2018/3/27)
Line 55: Line 55:
== Stage 4 ==
 * Locking of MI in vacuum with cryogenic ETMx/y with data stored
== Operation ==
 * 2018/4/27-5/6
 * [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1 operation wiki page]]
Line 60: Line 62:


-----
 * 2018/5/28 [[KAGRA/Commissioning/Meetings/Others/20180528/Phase1|Meeting for looking back to phase1 for future of KAGRA]] as an extended chief meeting.

Stage 1

  • Alignment up to BS


Stage 2

  • Align ETMy to IFI (MIF, DGS, VIS, CRY, IOO) with damping
  • Lead MI-REFL beam outside the chamber (MIF, IOO)
  • Install and align MI-REFL output optics using the beam reflected by ETMy (MIF)


Preparation

  • Oplev: 準備は進んでいる。(阿久津)
  • Actuator: 動かせるようになっている。
  • Dampig: センサーの準備をしているところ。PDの光は見えている。
  • RT model:
  • ビームセンターはTcamで見る。
  • 透過光用にBRTはインストールするが、おそらくPhase1では見えない。
  • エンドの物品の準備 -> 和泉

  • 人員手配 -> MIF

Tasks

  • EYCのTypeAとPayload接続完了 (2017/12/1)

  • ETMYでの光確認 (2017/12/12、和泉)

  • ETMYのアクチューエターの確認 (2017/12/18、牛場)

  • BSのdampingの確認 (2017/12/14, 和泉、長野、川崎、正田)

  • ETMYからの光をセンターエリアで確認 (2017/XX/XX、XX)
  • REFLまでの引きこみ (2017/XX/XX、XX)

Meetings

Check list


Stage 3

Tasks

  • Alignment of ETMx
  • Locking of MI with Cryogenic ETMy with Calibrated sensitivity curve

Check list


Operation


Test run


KAGRA/Commissioning/Phase1/Task (last edited 2018-05-24 11:21:22 by OsamuMiyakawa)