2115
Comment:
|
2317
|
Deletions are marked like this. | Additions are marked like this. |
Line 50: | Line 50: |
* [[/CheckList/20180307_VacuumETMX|Vacuum start at ETMX]] (2018/3/7) | * [[/CheckList/20180307_VacuumETMX|Vacuum start at ETMX]] (2018/3/27) |
Line 55: | Line 55: |
== Stage 4 == * Locking of MI in vacuum with cryogenic ETMx/y with data stored |
== Operation == * 2018/4/27-5/6 * [[KAGRA/Commissioning/Phase1/Operation|bKAGRA phase1 operation wiki page]] |
Line 60: | Line 62: |
----- * 2018/5/28 [[KAGRA/Commissioning/Meetings/Others/20180528/Phase1|Meeting for looking back to phase1 for future of KAGRA]] as an extended chief meeting. |
Stage 1
- Alignment up to BS
Stage 2
- Align ETMy to IFI (MIF, DGS, VIS, CRY, IOO) with damping
- Lead MI-REFL beam outside the chamber (MIF, IOO)
- Install and align MI-REFL output optics using the beam reflected by ETMy (MIF)
Preparation
- Oplev: 準備は進んでいる。(阿久津)
- Actuator: 動かせるようになっている。
- Dampig: センサーの準備をしているところ。PDの光は見えている。
- RT model:
- ビームセンターはTcamで見る。
- 透過光用にBRTはインストールするが、おそらくPhase1では見えない。
エンドの物品の準備 -> 和泉
人員手配 -> MIF
Tasks
EYCのTypeAとPayload接続完了 (2017/12/1)
ETMYでの光確認 (2017/12/12、和泉)
ETMYのアクチューエターの確認 (2017/12/18、牛場)
BSのdampingの確認 (2017/12/14, 和泉、長野、川崎、正田)
- ETMYからの光をセンターエリアで確認 (2017/XX/XX、XX)
- REFLまでの引きこみ (2017/XX/XX、XX)
Meetings
Check list
Vacuum start at ETMY (2017/12/4)
Stage 3
Tasks
- Alignment of ETMx
- Locking of MI with Cryogenic ETMy with Calibrated sensitivity curve
Check list
Vacuum test at Center (2018/3/7)
Vacuum start at ETMX (2018/3/27)
Operation
- 2018/4/27-5/6
Test run
2018/5/28 Meeting for looking back to phase1 for future of KAGRA as an extended chief meeting.