Size: 404
Comment:
|
← Revision 6 as of 2018-09-24 22:01:56 ⇥
Size: 1117
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 2: | Line 2: |
* [[http://klog.icrr.u-tokyo.ac.jp/osl/?r=6269]] | |
Line 7: | Line 8: |
[[KAGRA/Subgroups/AOS/TMSX_O3/2018-09-21/PreparationForTMSXOpticInstallation|Preparation For TMSX Optic Installation part2]] | * Shown in the above links and the below. * [[KAGRA/Subgroups/AOS/TMSX_O3/2018-09-21/PreparationForTMSXOpticInstallation|Preparation For TMSX Optic Installation part2]] |
Line 10: | Line 12: |
* Repairing some damaged parts * Replace the damages actuator coils. * Lay cables for TMS and TMS-VIS * Need to count the required number and length of the cables (on Sept 26??). * Configure the digital models properly. * Engage the logical channels and the assigned physical channels. * Install geophones. * Install TMS-VIS into the chamber. * Install BRT on it. * Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9015|here]]. |
20180921
Today's activities
Workers: Akutsu, K. Nagano, T. Tanaka, N. Fujii
- Shown in the above links and the below.
Next plan
- Repairing some damaged parts
- Replace the damages actuator coils.
- Lay cables for TMS and TMS-VIS
- Need to count the required number and length of the cables (on Sept 26??).
- Configure the digital models properly.
- Engage the logical channels and the assigned physical channels.
- Install geophones.
- Install TMS-VIS into the chamber.
- Install BRT on it.
Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See here.
Wanted!
- Tester!! lend from DGS or PEM??
- First contact to clean the side diameter of the optics.