Size: 455
Comment:
|
Size: 798
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
Shown in the above links and the below. | |
Line 11: | Line 11: |
* Repairing some damaged parts * Replace the damages actuator coils. * Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=9015|here]]. |
20180921
Today's activities
Workers: Akutsu, K. Nagano, T. Tanaka, N. Fujii Shown in the above links and the below. Preparation For TMSX Optic Installation part2
Next plan
- Repairing some damaged parts
- Replace the damages actuator coils.
Clean the sides of the optics to be installed into the vacuum chamber. (Ethanol+Acetone wiping with vectra alpha, then First Contact.) See here.
Wanted!
- Tester!! lend from DGS or PEM??
- First contact to clean the side diameter of the optics.