Differences between revisions 2 and 6 (spanning 4 versions)
Revision 2 as of 2019-02-04 11:15:24
Size: 1850
Comment:
Revision 6 as of 2019-06-04 19:56:23
Size: 1925
Comment:
Deletions are marked like this. Additions are marked like this.
Line 5: Line 5:
||<<MonthCalendar(,2019,6)>>||<<MonthCalendar(,2019,7)>>||<<MonthCalendar(,2019,8)>>||
Line 8: Line 8:
 * [http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/AOS/TMSX_O3|Wikipage of TMSX for O3]]  * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/AOS/TMSX_O3|TMSX for O3]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSY1|TMSY phase 1]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSX1|TMSX phase 1]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation at Mitaka]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8962|TMS in-air part (GPT part) optical layout (Nagano)]]
Line 15: Line 19:
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8962|TMS in-air part (GPT part) optical layout (Nagano)]]
Line 17: Line 20:
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSY1|TMSY phase 1]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMSX1|TMSX phase 1]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/subgroup/AOS/TMS-VIS0|TMS-VIS preparation at Mitaka]]

Transmission Monitor (TMS) at EYT (For O3)

  • (To be) with a vibration isolation stage (VIS).
  • TMS = BRT (beam reducing telescope) + GPT (Gouy phase telescope)

<< <  2019 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28      

<< <  2019 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31

<< <  2019 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          

<< <  2019 / 6 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30

<< <  2019 / 7 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2019 / 8 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  

Task list

Note: some of the tasks can be done in parallel.

  • Place/install the TMS-VIS (TMS's vibration isolation stage).
  • Place/install the BRT on the TMS-VIS

Signal Assign

Pin Name

Resistance

Equipment

Assign

Comment1

Comment2

Connection

KAGRA/Subgroups/AOS/TMSY_O3 (last edited 2019-06-04 19:56:23 by TomotadaAkutsu)