Size: 3387
Comment:
|
← Revision 119 as of 2025-09-12 11:36:20 ⇥
Size: 3433
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 3: | Line 3: |
= Sapphire and Thermal Noise = * [[KAGRA/Subgroups/CRY/Sapphire|Sapphire]] |
|
Line 30: | Line 34: |
= Sapphire and Thermal Noise = |
Contents
Sapphire and Thermal Noise
Design & Drawings
Document
・ICD
How to use Phytron motor (cryo-payload stepping motor)
クライオスタット姿勢変動 不同沈下
Schedule
Figure about cryogenic payload (It should be replaced).
Meeting
Cryogenic System Integration Meeting : 13:30 of every Tuesday (ICRR)
Cryogenic payload meetings are held on 15:00 of every Tuesday (ICRR)
Action Items list