KAGRA Commissioning status at DET meeting
- Date : 2022/09/26
Overall schedule
- Overall schedule
- 9/12 Start pumping down
- Still there are some leak around PR2-PR3 and SRM
- 9/20 - 9/22 Interferometer commissioning, toward finalize the OMC
- 9/28 - 9/30 Closing the IMM-PRM
- 9/12 Start pumping down
- Interferometer overall
- FPMI lock succeeded!
DARM(AS17), CARM(REFL45), MICH(REFL51->POP17)
Latest sensitivity klog22097
- Calibration evaluation
- Control filter optimization
- Interferometer characterization
- Beam profile check
- after IMMT2
- OMC
- FPMI lock succeeded!