- Site work
- 1/30 - 2/3 Repair the leak at OMC area
- PLL with new laser
- FPMI lock
- Lock enable
- Silent run sometimes performed
- FPMI with DC readout and ISS locked
- PRFPMI lock trial
- PRMI lock stable
- Establish the initial alignment
- Bottle neck is the noise level of ALS
- It made difficult to hand over from GR to IR
- How to brand for hand over
- Implementation of the PNC(Phase Noise Cancellation) to reduce the 0.4Hz resonant peak
- In vac optical table and put the steering mirror on it
- Reducing the air disturbance
- ASC implementation
- Evaluate offset map
- Trial of the implementation of the ASC loop
KAGRA/Subgroups/DET/Meeting/230118 (last edited 2023-01-18 08:03:06 by TakaakiYokozawa)