Status of the KAGRA commissioning 230510
- Status
- Sensitivity 1.2 -1.4 Mpc
- From the results of CAL/DET day at 4/26, calibration is consistent with previous measurement
- Effect of earthquake at Noto peninsula
- 5th May : Magnitude 6.7 at Noto peninsula
- Several earthquakes are still happened
- Interferometer is already recovered
- Re-alignment at PSL room will be performed today
- Commissioning work
- Alignment sensing and controls
- We need the PR3 global control to keep the stable opleration
- Trial is ongoing
- If trial is not succeeded until the O4a, we will sometimes perform manual alignment
- OMC alignment control problem
- Fixing is ongoing
- If trial is not succeeded until the O4a, we will sometimes perform manual trouble shooting
- We need the PR3 global control to keep the stable opleration
- Tapping test and shaker injection
- We performed the tapping test(Vibration injection test by hand) at 4/25 and 4/29
- OMC chamber is most sensitive part, we performed the shaker injection test
- Analysis is ongoing
- Increasing the laser power
- Toward the stable operation is higher priority, so if possible we will try to increase the laser power
- Glitch investigation
- ETMY oplev glitch
- Solved by install the temperature control system
- ITMY suspension glitch
- Try to install the IR/GR filter in front of oplev QPD
- IPC glitch
It sometimes happened that the time series sometimes jump during observation example(klog24930)
- Trial of slim down the real time model
- Trial the glitch reason by Sawada-san
- 37 Hz glitch
It detected in OMC signal klog25106
- 37 Hz and its harmonics frequency excited
- Seeing in hveto analysis(?)
- The reason is not understand yet
- ETMY oplev glitch
- Lock loss investigation
- Ongoing
- Alignment sensing and controls