Differences between revisions 1 and 35 (spanning 34 versions)
Revision 1 as of 2011-02-10 14:59:23
Size: 97
Editor: YoichiAso
Comment:
Revision 35 as of 2016-06-13 16:58:05
Size: 1284
Comment:
Deletions are marked like this. Additions are marked like this.
Line 1: Line 1:
## page was renamed from LCGT/subgroup/ifo/MIF
Line 3: Line 4:
||[[LCGT/subgroup/ifo/ISC/Meetings|Meetings]] ||[[LCGT/subgroup/ifo/MIF/OptLayout|Optical Layout]] ||[[KAGRA/Subgroups/MIF/Commissioning|Commissioning]] ||[[LCGT/subgroup/ifo/MIF/HotIssues|Hot Issues]] ||
||[[KAGRA/Subgroups/MIF/Members|Members]] ||[[LCGT/subgroup/ifo/MIF/OptParam|Optical Parameters]] ||[[InstrumentControl|Instrument Control]] ||[[KAGRA/Subgroups/MIF/NoiseBudget|Noise Budget]] ||
||[[KAGRA/Subgroups/MIF/TaskList|Task List]] ||[[KAGRA/Subgroups/MIF/AEL|Analog Electronics]] ||[[LCGT/SVN|SVN]] ||[[LCGT/subgroup/ifo/ISC|ISC page]] ||
|| ||[[MIFInterfaces|Interfaces]] || ||[[KAGRA/Subgroups/MIF/GreenLock|Lock Acquisition]] ||




== Subsystem Definition ==
This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.

This working group's task is to set the optical parameters of the MIF (except for the ones set by the detector configuration group) and design the sensing and control scheme for the length and alignment. We are also responsible for maintaining the detailed optical layout.

Main Interferometer Subsystem

This is a Wiki page for Main Interferometer Subsystem (MIF).

Meetings

Optical Layout

Commissioning

Hot Issues

Members

Optical Parameters

Instrument Control

Noise Budget

Task List

Analog Electronics

SVN

ISC page

Interfaces

Lock Acquisition

Subsystem Definition

This subsystem is the main interferometer part of LCGT. The MIF consists of PRC, BS, Arm cavities and SRC. OMC is at the interface between the MIF and the Output Optics group.

This working group's task is to set the optical parameters of the MIF (except for the ones set by the detector configuration group) and design the sensing and control scheme for the length and alignment. We are also responsible for maintaining the detailed optical layout.

KAGRA/Subgroups/MIF (last edited 2022-10-26 08:40:33 by KeikoKokeyama)