Size: 1982
Comment:
|
Size: 2044
Comment:
|
Deletions are marked like this. | Additions are marked like this. |
Line 7: | Line 7: |
|| [[KAGRA/Subgroups/PEM/ADC |ADC and Racks for PEM]] || [[KAGRA/Subgroups/PEM/RachCable | Rack and cabling check]] || || [[KAGRA/Subgroups/PEM/TASK/LongTerm | Long term tasks]] || | |
Line 13: | Line 13: |
* [[KAGRA/Subgroups/PEM/ADC |ADC and Racks for PEM]] | |
Line 20: | Line 19: |
* [[KAGRA/Subgroups/PEM/RachCable | Rack and cabling check]] |
Physical Environment Monitors (PEM) Subgroup
General |
Projects |
Tasks |
Documents |
|
General informations
Projects
PEM tasks
Documents
Member list
Chief:
- 横澤 孝章 Takaaki Yokozawa (ICRR)
Sub-Chiefs:
- (To be discussed)