== Schedule ==
[[https://dacgit.icrr.u-tokyo.ac.jp/projects/kagra/issues/gantt|Gantt chart]]
Line 10: Line 12:
 * Blueprint [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=12587]]
Line 12: Line 15:
   * Installing the shields and BeamDumps for IMC [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=11636]]
The following are somewhat old but maybe useful to trace what were going on at that time.
 * Locations of beam dumps in vacuum chambers of iKAGRA [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=3900]]
 * 主にAOSの立場から見たiKAGRAインストールおよびコミッショニング作業での課題と教訓 [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=5202]]
 * IOO(MCF, MCE, IFI, IMM) 3D drawing (just for working) [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2507]]
 * About MCe transmission port [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2640]]
 * About MCo transmission 2 beam [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2605]]
 * About the laser guide duct [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=2518]]
Line 14: Line 24:
== Related areas ==
MCF, MCE
=== Layout Information ===
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=10506]]
 * [[http://gwwiki.icrr.u-tokyo.ac.jp/JGWwiki/KAGRA/Subgroups/IOO/OutputTables/Optics]]
 * [[https://granite.phys.s.u-tokyo.ac.jp/svn/KAGRA/trunk/ioo/]]
 * [[https://gwdoc.icrr.u-tokyo.ac.jp/cgi-bin/private/DocDB/ShowDocument?docid=8565]]

== Areas involved ==
MCF, MCE, (PSL)

Upgrade IMC for O4

<< <  2021 / 2 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28

<< <  2021 / 3 >  >>
Mon Tue Wed Thu Fri Sat Sun
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30 31        

<< <  2021 / 4 >  >>
Mon Tue Wed Thu Fri Sat Sun
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30    

<< <  2021 / 5 >  >>
Mon Tue Wed Thu Fri Sat Sun
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            

Schedule

Gantt chart

The following are somewhat old but maybe useful to trace what were going on at that time.

Layout Information

Areas involved

MCF, MCE, (PSL)

Task list

Note: some of the tasks can be done in parallel.

  • Attach black shielding around the MCi, MCo, and MCe suspensions for mitigate stray light
    • Relocate the connector plates of these suspensions.
    • Tame the electric wires from the coil bobbins.
  • Put beam dumps in the MCE and MCF chambers.
  • Confirm the position of POM1
  • Attach the beam dump to POM1
  • Confirm the position of a mirror (and the size) for MCo oplev
  • Confirm each suspension can work very well (acceptance test)
  • Alignment sensing control.
    • Confirm no clipping of the beams.
  • Confirm the laser beams are not hitting strange things such as coil wires and so on.
  • Make the final 3D model inside of the MCF and MCE chambers before closing them.