Installation Procedure for Type-B suspensions
Preparation at the NAOJ
- Pre-assembly of the payload parts (RM, IM, IMRM)
- Assembly and shipping of the bottom filters
Preparation at Akeno
- Shipping of the IP and standard filters
KAGRA/Subgroups/VIS/Installation/Type-B (last edited 2015-07-11 07:15:55 by YoichiAso)