Installation Procedure for Type-Bp suspensions
Contents
Preparation at the NAOJ
- Pre-assembly of the payload parts (RM, IM, IMRM)
- Assembly and shipping of the bottom filters
- Assembly and shipping of the traversers
- Attachment of the magnets on the mirrors
Preparation at Akeno
- Send standard filters and earthquake stops from Akeno to Kamioka
Out sourced works
- Installation of the inner frame
Installation at Kamioka
- Preparation
- - Clean up the work area - Make sure everything is ready
- Install the inner frame