TAMA prototype
installation: https://goo.gl/photos/dTZzjq7XoKSmGLfW6
iKAGRA PR3
10/5 :(parts check) https://goo.gl/photos/1emitmmWFwMDdUMb6
10/6 :(IM setting) https://goo.gl/photos/ffXipxFyRTe1u3L8A
10/7 :(IM alignment/RMassembly/Oplev test) https://goo.gl/photos/Shc9e2T7WNMpBhqCA
10/8 :(Moving hanging frame) https://goo.gl/photos/WN71b3Ejuq78kXRT7
10/9 :(OSEM flag assembly/TMhanging preparation) https://goo.gl/photos/Y4teQx1pGUGzuT9Z6
10/12 :(Hanging TM) https://goo.gl/photos/hTtQDEXZXcdj2bv37
10/13 :(Re-hanging TM) https://goo.gl/photos/JtpcKFvLrDJVLsF29
10/14 :(TM alignment) https://goo.gl/photos/mVroZU1VwuJLCpF67
10/15 :(RM setting) https://goo.gl/photos/VodCe55XUbxYT7oo7
10/16 :(RM hanging) https://goo.gl/photos/vSpMGxW8gLNLeNM4A
10/19 :(RM alignment) https://goo.gl/photos/FrWanaqvCMPT4mjRA
10/20:(OSEM cabling) https://goo.gl/photos/BG9uJkwKHEyaJe6M8
10/21:(OSEM cabling/Traverser assembly) https://goo.gl/photos/og9rzL7px8G7Wtot5
10/22:(OSEM cabling/ Traverser alignment) https://goo.gl/photos/cDxkKDYisVyvM8Zy7
10/23:(OSEM cabling) https://goo.gl/photos/8k4FKZ3BjhRMJtZa7
10/27:(Traverser alignment) https://goo.gl/photos/SrPJ4nhaRDyuDZgD7
10/28:(Re-hanging RM) https://goo.gl/photos/BD6vChQ8k4HD8KBX6]
10/29:(Traverser setting) https://goo.gl/photos/ShJHMskRfNLpnwTFA
10/30:(EQ stop assembly/connect Traverser) https://goo.gl/photos/EVpp6FD8fCiDJLw39
11/2:(Remove galling screws) https://goo.gl/photos/1WcwtBHbGLzSvaW66
11/3:(EQ stop re-connection) https://goo.gl/photos/xZKtGMGrgtiQNj1n7
11/4:(EQ stop re-connection) https://goo.gl/photos/XmKfdraERZg1drxJ8
11/9:(Set BF on interface plate) https://goo.gl/photos/Gho3QNkDe35FzuqK6
11/10:(Hanging IM) https://goo.gl/photos/zmRgnAsvLMmY4ii9A
11/11:(Weight adjustment) https://goo.gl/photos/7xDy7fZiZZL4S3Ps8
11/12:(Signal check) https://goo.gl/photos/Tp7hGwxsY3btVhKR8
11/13:(Weight check) https://goo.gl/photos/j9Bjbg9VmLzCqbGu7
11/16:(OSEM alignment) https://goo.gl/photos/nJCYoCF9WADrPkXD8
11/17:(Mass adjustment) https://goo.gl/photos/54W5oo3gV7jJWEoy6
11/18:(Weight measurement) https://goo.gl/photos/sqTbaQtD3s1adGwQ7
11/19:(Assemble IRM) https://goo.gl/photos/h9PHZ4QqhywHZwFeA
11/20:(Assemble IRM) https://goo.gl/photos/5Q3Ei1u7qkUqygku7
11/24:(balance IM) https://goo.gl/photos/S58YLFLd4NL8BPgS6
11/25:(IM OSEM alignment) https://goo.gl/photos/WusK8661ioMRdama7
11/27:(cabling) https://goo.gl/photos/CTGGV9FdFW25Buti9
- 12/7:
- 12/8:
12/10:(installation into the chamber) https://goo.gl/photos/3MQSJRft9ixqgSdq9 (Agatsuma)https://goo.gl/photos/emTk474Q4sxsz2s8A (Fujii) https://goo.gl/photos/ddyjKbLSudSCRELd8 (Interval Camera)
- 12/11:
12/14:(Removing the jacks on the inner frame) https://goo.gl/photos/szqcsn7ysdKB8d9MA
12/15:(Cleaning test/Hammering test) https://goo.gl/photos/p9h1RT7nq35jGCrNA
- 12/16: Cabling
12/17: (Signal check/release suspension) https://goo.gl/photos/zWX5uJT1PB8aMdty6
1/16: (Mirror position measurement) https://goo.gl/photos/7TCme5N2pi5aHcBx9
1/19: (Traverser repair) https://goo.gl/photos/ycK5crfinQJJbwRw7
1/20: IM leveling https://goo.gl/photos/bA2n3sQZUYfhnCdw8
1/21: TM hanging① https://goo.gl/photos/mvGMGAoZH1zCCq9L8
1/22: RM installlation① https://goo.gl/photos/cKb8hWSDAtf5W36q6
1/25: TM flag accident① https://goo.gl/photos/hD9rTiXS5Sqf2h4q9
1/26: TM glue check https://goo.gl/photos/A7by9BXiuSxsJwsn8
2/8: TM hanging② https://goo.gl/photos/wYUoAMZTbPk8ixb2A
2/9: RM installlation② https://goo.gl/photos/3Vc2cmmDWb5eqecq7
2/10: BF stage installlation https://goo.gl/photos/Ts4FfeppnTdRcgao6
2/15: IM balancing https://goo.gl/photos/PoHHANYB6u5rYYvw6
2/17: TM flag accident① https://goo.gl/photos/qeCnDP2jBAoTgbJ58
2/23: Cabling https://goo.gl/photos/3bVXNRzwkuRoGoJL6
2/24: Cleaning https://goo.gl/photos/vYefbSVbQtVnq74f7
2/25: Installation https://goo.gl/photos/aSfpzLNFQm2RGZjo8
2/25: After installation https://goo.gl/photos/xw9Fo9AxfCQ8gbmCA
interval camera movie: https://goo.gl/photos/3bx6KRh2PoXpGiAq8
TAMA suspension for iKAGRA
Others
iKAGRA PR2 https://goo.gl/photos/FQsg99C6WNMZ5YoL9
iKAGRA AOS https://goo.gl/photos/dHkfXpGnfrsdgqWp6