Agenda/Minutes of the VIS Meeting on 2016/10/14
2016/10/14 13:30 -
Participants:
Progress report
Type-A (Takahashi)
- Pre-isolator: The sensitivity measurement of ACC is on going at the site.
- EQ stop, release sensor, dummy payload: Production is on going.
- Bottom Filter: Assembly of the second BF was finished. SUS bearings were delivered.
- BF damper: The bidding was announced on 14th. Open bidding is on 9th November.
- Maraging wire: We asked Obuchi-san redesign of the wire for Type-A with safety margin of 2.
- Installation: Review on the installation procedure will be held on 4th November.
Type B (Mark)
- Put a report here
Type-Bp (Shoda)
- Put a report here
IMMT (Ohishi)
- 2D/3D drawings
- Uploaded slightly simplified (=some parts removed) step and dwg files of TAMA TM/RM type suspension to Dropbox (Subsystems/VIS/TypeC/).
- Please notice there still remain some small mistakes.
- Uploaded slightly simplified (=some parts removed) step and dwg files of TAMA TM/RM type suspension to Dropbox (Subsystems/VIS/TypeC/).
- Transfer function of Pitch-Pitch and Yaw-Yaw of IMMT suspensions as iKAGRA ETMs
Fitting was done by Kasuya-san, Hisatomi-san, and Shimoi-san.
Kasuya-san kindly wrote How to use LISO in Japanese.
- Compared with TAMA data, phase delayed at higher frequencies.
- Discussed movable range of the mirror system with equipped xy stages.
- Originally the xy stage move mirror system (Mirror/IM/Magnet box/coil support) +/-2.5mm.
- MIF people require +/-1cm.
Watchdog system (Tanaka)
- Put a report here
Safety
- Any issue ?
Discussion
- Maraging and SUS rod issue follow up.
- Order status: Type-B Maraging rods, SUS rods
- Type-A Maraging rod re-optimization status (Takahashi)
- Nail head diameter 9mm (possible ?)
Site work plan for the next week
- Mon: BS test hanging
- Tue: BS test hanging
- Wed: BS test hanging
- Thu: BS test hanging
- Fri: BS test hanging
Travel Plans
- Travel (Week of 10/17):
- Takahashi:
- Shoda:
- Mark: 17-21
- Fabian: 17-21
- Okutomi:
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
- Travel (Week of 10/24):
- Takahashi:
- Shoda:
- Mark: 24-27 (BS)
- Fabian: 24-27 (BS)
- Okutomi: 24-27 (PI realtime model development)
- Fujii:
- Ishizaki:
- Hirata:
- Sato:
- Ohishi:
Next meeting
2016/10/21(Fri) 13:30 - VIS F2F: Oct. 28, Nov. 18, Dec. 2