Agenda/Minutes of the VIS Meeting on 2017/7/21
2017/7/21 13:30 -
Participants:
Progress report
- Type-A:
- Type-B:
- Type-Bp:
Type-A (Takahashi)
Past week report
Plan for coming weeks
Type B (Mark)
Past week report
Plan for coming weeks
Type-Bp (Shoda)
Past week report
- IM TF measurement
- IM TFs seem to be OK.
- The coupling from IML to TMP could not be observed with Oplev with a good coherence. The coupling ration should be less than 10^-1 rad/m with a rough estimation. (Some parameters need to be checked.)
- All parts are assembled on the suspension.
- BF/BFRM parts are assembled except that BF/IM/TM are not suspended from the SF.
- Cabling is almost done.
- Berndy male pins are running out.
Plan for coming weeks
- Suspend the BF and blow from the SF, and adjust the weight and the balance
- TF check
- Installation preparation
- Prepare for PRM Traverser shipping.
IMMT (Ohishi)
Past week report
Plan for coming weeks
Watchdog system (Tanaka)
Past week report
Plan for coming weeks
Other site works
- 7/25 - 26: Y-arm water pump exchange
- End of Aug. to Nov.: Mozumi entrance will be closed
Safety
- Incidents:
- Foreseen risks
- Type-A:
- Type-B:
- Type-Bp:
Discussion
Travel Plans
- Travel (Week of 7/24):
- Takahashi: 24 - 28
- Okutomi: 24 - 28
- Sato: 24 - 28
- Ishizaki: 24 - 28
- Mark: 24 - 28
- Fabian: 24 - 28
- Hirata: 25 - 28
- Enzo:
- Shoda: 24 - 27
- Ohishi:
- Fujii:
- Tanaka: 25 - 26 (27)
- Kuroki: 25 - 28
- Hashimoto(Hosei): 24 - 27
- Yoshioka (Toyama): 25,26,28
- Travel (Week of 7/31):
- Takahashi:
- Okutomi:
- Sato:
- Ishizaki:
- Mark:
- Fabian:
- Hirata:
- Enzo:
- Shoda:
- Ohishi:
- Fujii:
- Tanaka:
- Hashimoto(Hosei):
- Yoshioka (Toyama): 1,2,4
Next meeting
On 2017/7/28(Fri)